Laserfiche WebLink
Xcel y <br /> Ener sM <br /> g <br /> OUTDOOR LIGHTING 1971 Gateway Boulevard <br /> Arden Hills, Minnesota 55112-2750 <br /> In this agreement,Northern States Power Company d/b/a Xcel Energy is called"Xcel Energy" and the <br /> Customer is called"I" or"my".Customer and Xcel Energy agree to the following terms and conditions: <br /> 1. Request for Outdoor Lighting Services. I request that Xcel Energy install outdoor lighting at the <br /> location designated above and/or the approximate location as shown on the attached exhibit. I grant <br /> Xcel Energy any right,privilege and easement to install,operate and maintain its underground facilities <br /> on the property. <br /> 2. Installation Requirements.I agree that,prior to Xcel Energy starting work: (1)the route of Xcel <br /> Energy's service installation shall be accessible to Xcel Energy's equipment; (2) I will remove all <br /> obstructions from the route at no cost or expense to Xcel Energy;(3) I will clearly mark all septic tanks, <br /> drain-fields,sprinkler systems,water wells,owner-installed electric or pipeline facilities,or other <br /> customer-owned facilities in the installation route; and(4) the ground elevation along the route shall not <br /> be above or more than four inches below the final grade. Xcel Energy will contact Gopher State One Call <br /> to locate 3rd party utility facilities (phone,cable, etc.) on my property.I agree Xcel Energy is not <br /> responsible for damage to customer-owned underground facilities not marked at the time of outdoor <br /> lighting service installation. <br /> 3. Installation Cost Contribution. I agree to pay an installation cost contribution provided in Project <br /> Charges on page one. I understand that I am responsible for any additional installation costs incurred by <br /> Xcel Energy because of(1) soil conditions that impair the installation of underground facilities, such as <br /> rock formations, etc., and(2) sidewalks,curbing,black top,paving, sod or other landscaping and <br /> obstructions along the cable route,such as extensive existing underground facilities, etc. <br /> 4. Winter Construction Charges. I understand Winter Construction Charges may apply if underground <br /> facilities are installed between October 1 and April 15.When construction scheduling does not permit <br /> installation of underground facilities to be completed prior to October 1 or after April 15 and Xcel <br /> Energy determines winter conditions exist,I agree to pay Winter Construction Charges if I request Xcel <br /> Energy to complete the construction during aforementioned time. <br /> Xcel Energy will agree to complete installation at my request if winter condition exists with a frost line of <br /> less than 6 inches. If winter conditions exist with a frost line 6 inches or above,construction will be <br /> scheduled for after April 15. <br /> 5. Restoration.Xcel Energy will restore the boulevard and will backfill the service trench on my property <br /> with existing soil so the trench is level and dean. I am responsible for the final compacting,loam, <br /> seeding,sod or watering of service trench at my expense. I will also be responsible for restoration in areas <br /> where I have exposed my underground facilities listed above. <br /> 6. Relocating Facilities. I agree to pay the cost of relocating any portion of said underground facilities <br /> made to accommodate me or required due to altering of grade,additions to structures,installations of <br /> patios,decks, gardens, sidewalks,curbing,paving, blacktop,sod,landscaping or any other condition <br /> which makes maintenance of the Xcel Energy's facilities impractical. <br /> 7. Ownership of Facilities. The entire ornamental streetlight system including underground cables, <br /> conduit,posts,lamps, ballast,starters,photocells, and glassware installed by Xcel Energy,shall be the <br /> property of Xcel Energy.I have no ownership interests or rights in these facilities.Any payments I make <br /> or my contractor shall not give entitlement to any ownership interest or rights therein. <br /> Xcel Energy Proprietary&Confidential Page 2 of 2 11/20/01 <br />