Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
#2640/2641 Orono Ambar LLC. (cont.) <br /> General Concept Plan Review <br /> Page 2 of 7 <br /> Section 10.53 is the Code section that defines the standards and review process for a Highway 12 PUD and <br /> Section 10.52 defines the special requirements for rezoning along the Highway 12 corridor and study area. <br /> Those Code sections have been attached as exhibits to this report. <br /> General Concept Approval <br /> The General Concept Approval is required as part of the Highway 12 PUD rezoning and development plans. <br /> A General Concept Approval would be similar to a Preliminary Plat approval without actually giving the <br /> Preliminary Plat until other issues have been resolved. A resolution could be adopted by the Council for the <br /> Concept Approval with all conditions that must be met by the developer for the Plat approval. The City is <br /> not in a position to approve the rezoning or plat until a TIF option is approved by the Council. State laws <br /> require notification and public hearings for a TIF that would not be heard by the Council until this Spring. <br /> Conditions of the General Concept Approval would include that the financing be approved and the Council <br /> adopt the RPUD zoning district with the final development plans. <br /> Review of Issues Discussed Previously by the Planning Commission and City Council <br /> The primary changes to the proposal since the November review are the total units in the senior building <br /> have been reduced from 70 to 62, a trail connection has been added to the plans to provide connections to <br /> the regional trail system, the senior building has been relocated further to south to minimize impacts to the <br /> residential properties to the north, and the through street has had the two sided parking areas relocated to <br /> avoid backing out into through traffic. <br /> The applicant has provided site plans for both properties. A commercial site plan review for the office and <br /> senior housing properties and buildings will include a full review of the following items: <br /> 1) Landscaping <br /> 2) Traffic Flow/Road System <br /> 3) Parking Arrangement <br /> 4) Building Height/Setbacks <br /> 5) Review of Architectural Materials/Building Design <br /> 6) Lighting <br /> 7) Screening <br /> I. Preliminary Subdivision/Rezoning/Comprehensive Plan Amendment <br /> Uses within the PUD may include only those uses designated by the official Comprehensive Land Use Plan. <br /> The 1989 Comprehensive Plan Amendment had guided the property for commercial use. The <br /> Comprehensive Plan(CMP)as preliminarily approved by the City Council in September designated several <br /> Orono properties as areas that would allow medium density. The density proposed in the CMP does not have <br /> an existing zoning district that would allow the types of housing that would be offered by as proposed in this <br /> application. The proposed CMP did not include this property as a residential site. In fact it has been guided <br /> for commercial use as was the case with 1989 CMP amendment. The entire property has been zoned B-1 <br /> since at least 1967, perhaps earlier. To rezone the east property would require changing the land use <br /> designation to residential. <br /> The 62 unit building on the 4 acre site would provide 15.5 units/acre of senior housing units at a variety of <br /> unit sizes and rental rates. The proposed RPUD zoning district would be the appropriate zoning district to <br /> provide the units/acre density requested. Section 10.33, Subdivision 5(E) in the proposed RPUD district <br /> would allow the City of Orono to provide incentives to encourage projects which are consistent with housing <br />