Laserfiche WebLink
• <br /> Section 10.53 is the Code section that defines the standards and review process for a Highway 12 <br /> PUD and Section 10.52 defines the special requirements for rezoning along the Highway 12 corridor <br /> and study area. Those Code sections have been attached as exhibits to this report. <br /> General Concept Approval <br /> The General Concept Approval is required as part of the Highway 12 PUD rezoning and <br /> development plans. A General Concept Approval would be similar to a Preliminary Plat approval <br /> without actually giving the Preliminary Plat until other issues have been resolved. A resolution <br /> could be adopted by the Council for the Concept Approval with all conditions that must be met by <br /> the developer for the Plat approval. The City is not in a position to approve the rezoning or plat until <br /> a TIF option is approved by the Council. State laws require notification and public hearings for a <br /> TIF that would not be heard by the Council until this Spring. Conditions of the General Concept <br /> Approval would include that the financing be approved and the Council adopt the RPUD zoning <br /> district with the final development plans. <br /> Review of Issues Discussed Previously by the Planning Commission and City Council <br /> The Orono Council did recommend the applicant proceed with the request to the Planning <br /> Commission for General Concept Plan approval. The primary changes to the proposal since the <br /> November review are the total units in the senior building have been reduced from 70 to 62, a trail <br /> connection has been added to the plans to provide connections to the regional trail system, the <br /> senior building has been relocated further to south to minimize impacts to the residential properties <br /> to the north, and the through street has had the two sided parking areas relocated to avoid backing <br /> out into through traffic. <br /> The applicant has provided site plans for both properties. A commercial site plan review for the <br /> office and senior housing properties and buildings will include a full review of the following items: <br /> 1) Landscaping <br /> 2) Traffic Flow/Road System <br /> 3) Parking Arrangement <br /> 4) Building Height/Setbacks <br /> 5) Review of Architectural Materials/Building Design <br /> 6) Lighting <br /> 7) Screening <br /> I. Preliminary Subdivision/Rezoning/Comprehensive Plan Amendment <br /> Uses within the PUD may include only those uses designated by the official Comprehensive Land <br /> Use Plan. The 1989 Comprehensive Plan Amendment had guided the property for commercial use. <br /> The Comprehensive Plan (CMP) as preliminarily approved by the City Council in September <br /> designated several Orono properties as areas that would allow medium density. The density <br /> proposed in the CMP does not have an existing zoning district that would allow the types of housing <br /> that would be offered by as proposed in this application. The proposed CMP did not include this <br /> property as a residential site. In fact it has been guided for commercial use as was the case with 1989 <br /> Orono Ambar,LLC. <br /> 2060 Wayzata Boulevard <br /> #2640/#2641 <br /> Page 2 of 7 <br />