Laserfiche WebLink
l <br />O O <br />C ITY of URONO <br />1, <br />4 <br />a1 t' 'yy t <br />rL <br />f%' ,Municipal Off'ices <br />i iM O P <br />k i/. <br />S % <br />C `a ° <br />Y;-'; <br />r° <;-` G! Street Address: Mailing Address: <br />9 '''•''' 'Q 2150 Kelley Parkway P.O. Box 66 <br />kEsK % Crystal Ba MN 55323•0066Orono, MN 5535fi y <br />To: The Current Owner of Address `^ <br />t r A SS <br />City Ordinance requires that onsite sewage treatment systems in Orono be <br />inspected on a periodic basis. The.onsite sewage treatment system at the above <br />address has been inspected and the following is known about the system. A <br />sketch of the known components of the system is available for most properties at <br />the Orono City Hall. <br />Imminent Public Health Threat <br />Yes <br />No — <br />If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br />days of receipt of this notice. The septic system must be brought into compliance <br />within 90 days. Failure to do so will result in referral to the City Attorney for <br />legal action. <br />System Identified as Non-Compliant <br />Yes <br />No <br />If yes, system must be brought into compliance by: <br />December 31, 2007 <br />December 31, 2010 <br />Other <br />Septic Tan ump out Needed <br />Yes <br />No <br />The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br />out every three years. City records indicate the tank(s)were last pumped out on <br />c'j .-;? ",.2 . The tank(s) should be cleaned through the manhole and <br />not through the inspection pipes,this allows for proper cleanin. <br />Comments: <br />Date of Inspection C '-C'- .Inspc <br />Telephone(9 2)?49-4600 • Fa.r-(9 2)249-461h