My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8-16-19 Septic Design
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
640 Lakeview Parkway - 06-117-23-34-0015
>
Septic
>
8-16-19 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:36 PM
Creation date
10/5/2021 4:21:14 PM
Metadata
Fields
Template:
x Address Old
House Number
640
Street Name
Lakeview
Street Type
Parkway
Address
640 Lakeview Pkwy
Document Type
Septic
PIN
0611723340015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
')) <br />28) <br />31) <br />D.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br />(this must match the soil boring log) desired mound ratio 2.7 <br />15 percent site slope (0-20% range) 15 (% downslope site slope, if different than upslope) <br />16 inches, or 1.3 ft. to Redox or other limiting condition (need at least 12" to be a Type 1) <br />Treatment zone contains inches of 0% soil credit, and =inches of 50% soil credit. Giving a: <br />20 inch, or 1.7 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br />27,0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />0.0 ft. upslope and sideslope <br />17.0 ft. Downslope <br />Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 12 ft. upslope berm <br />3:1 sideslope 16 ft. sideslope berms <br />3:1 downslope 29 ft. downslope berm <br />32- Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br />51 ft. wide by 95 ft. long Mound footprint <br />4" inspection pipe <br />18" cover on top <br />UUps_lope berm 12 �I L Downsloae berm 1 29 <br />12" cover on sides <br />(6" loamy cap & 6" topsoil) <br />1 Clean sand lift <br />1.3 Depth to Limiting <br />tinsg Condition "-------_�� <br />Absorption Width ---- <br />Note: <br />For 0 to 1% slopes, Absorption Width is measured from the 3&dequatly in both directions. <br />For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed. <br />33) Rock Bed: <br />10.0 ft. by 63.0 ft, by inches under pipe, plus 20% gives 21 yd3 or *1.4= 29 ton <br />> Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br />28.4 up + 158.8 downslope + 19.3 ends + 56.4 under rock =F 315 yd' or *1.4= 442 ton <br />plus 20% <br />35) Loamy Cap: <br />47 ft. by 91 ft. 6" deep, plus 20% gives 96 yd3 or *1.4= 134 ton <br />36) Topsoil: <br />51 ft. by 95 ft. 6" deep, plus 20% gives 108 yd' or *1.4= 151 ton <br />I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br />gner Signature <br />Rusty Olson"s Soil it Perc <br />Company <br />810 <br />License# <br />R/16/7()19 <br />vase <br />
The URL can be used to link to this page
Your browser does not support the video tag.