My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-04-2020 Septic Design
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
775 Lakeview Parkway - 06-117-23-43-0013
>
Septic
>
03-04-2020 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:28:57 PM
Creation date
10/5/2021 3:44:18 PM
Metadata
Fields
Template:
x Address Old
House Number
775
Street Name
Lakeview
Street Type
Parkway
Address
775 Lakeview Pkwy
Document Type
Septic
PIN
0611723430013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br />(this must match the soil boring log) desired mound ratio 1 2.7 <br />15 percent site slope (0-20% range) 15 (% downslope site slope, if different than upslope) <br />18 inches, or t.5 ft. to Redox or other limiting condition (need at least 12" to be a Type 1) <br />Treatment zone contains=inches of 0% soil credit, and =inches of 50% soil credit. Giving a: <br />18 inch, or 1.5 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONSH! <br />27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />0.0 ft. upslope and sideslope <br />17.0 ft. Downslope <br />Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4;1 upslope ratio 9 ft. upslope berm <br />3:1 sideslope 15 ft. sideslope berms <br />3;1 downslope 30 ft. downslope berm <br />Overall Dimensions: iEl <br />ft. wide by 63.0 ft. long Rock bed <br />ft. wide by 1 93 ft. long Mound footprint <br />4" inspection pipe <br />��� 18" corer on top <br />berm I I .I � 6 Downslope berm 30 <br />``-� 12" cover on sides <br />(6" loamy cap &6" topsoil) <br />1.5 Clean sand lift <br />1.5 Depth to Limiting <br />Limiting Condition ---_—__ <br />Absorlotion Width 127.0 1'—" _—__ --_— <br />Note: <br />_ <br />For 0 to 1 slopes, .4bsorptlon Width is measured from the f3edequalty in both directions. <br />For slopes >1%, Absarptron Width is measured downhill from the upslope edge of the Bed. <br />Rock Bed: <br />10.0 ft. by 63.0 ft. by inches under pipe, plus 20% gives =yd-' or *1.4= 29 ton <br />Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br />24.4 up + 143.1 downslope + 17.8 ends + 52.5 under rock =285 yd3 or *1.4m 399 ton <br />plus 20% <br />Loamy Cap: <br />45 ft. by 89 ft. 6" deep, plus 20% gives <br />Topsoil: <br />49 ft. by 93 ft. 6" deep, plus 20% gives <br />I hereby certify that I have completed this work in accordance <br />erSignature <br />89 yd'or*1.4= 125 ton <br />102 yd'or*1.4= 143 ton <br />all applicable ordinances, rules and taws. <br />Rusty Olson"s Soit lx Perc 810 <br />Company <br />11/18/2019 <br />cicenseff uate <br />
The URL can be used to link to this page
Your browser does not support the video tag.