Laserfiche WebLink
The manifold & supply line must have back drainage to the pumping chamber. Be <br />sure the rock & sand fill material are clean. The sod layer below the entire mounded <br />area must be turned over, just break up the sod. <br />All property lines must be located prior to installation. <br />If the tanks have less than 2' of cover, the lids, risers & maintenance hole covers <br />must be insulated to a value of R70. <br />Cleanouts for each lateral with a sleeve must be insulated & be accessible from <br />finished grade in an irrigation box with a ball valve. <br />All neighboring wells are located greater than 100' away from the proposed <br />treatment area. <br />Keep all heavy equipment off of the Proposed treatment area before and after <br />construction. The treatment area should be marked off before construction. This <br />design is not valid & the system will need to be relocated if failure to protect the <br />sites for new on-site sewage systems. <br />MANAGEMENT PLAN, <br />The tanks need to be maintained at a minimum of 1 time every 2 years, check with <br />your pumper to set up a schedule. <br />System inspected for areas by owner & or Inspector as determined by the local unit <br />of Government. <br />Any other requirements as determined by the local unit of Government. <br />With proper installation & maintenance, this system should have no problem in <br />treating septic effluent effectively. <br />