Laserfiche WebLink
Installer Summary <br />2250 gallon Septic tank (minimum) Tank options: none <br />Duo targer LanK WIUI rnurLiRre camp/Lanres <br />1250 gallon Dose tank (minimum) at 25.49 gpi <br />36 GPM @ 23 ft. of head, Pump required <br />8.0 inch swing on Demand float which translates to roughly 5.0 inches of float tether length <br />if time dosing is required -->I 5.6 Iminutes ON time EtEEI hours OFF time <br />20 inches from bottom of tank to "pump ON" float, or 12 inches to "timer ON" float <br />23 inches from bottom of tank to "Hi Level Alarm" or L_13_j inches to "Hi level alarm" if time dosed <br />90 ft. of z.0 inch supply line with end feed manifold connection <br />(Tip: "top feed" manifold to control drainback) <br />24 inch, or 2.0 ft. Sand Lift Mound <br />10.0 ft. wide by 63.0 ft. long Rock bed <br />3 laterals 2.00 inch diameter 61.0 ft. long 3A ft, lateral spacing <br />7/32 inch perfs 3.0 ft. perforation spacing <br />No Effluent filter Et alarm <br />3 clean out Et valve box assemblies <br />27.0 ft.Total sand ABSORPTION width (minimum) <br />0.0 ft. upslope and sideslope (sand beyond rockbed, minimum) <br />17.0 ft. Downslope (sand beyond rockbed, minimum) <br />Specific slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 14 ft. upslope berm <br />3:1 sideslope13 ft. sideslope berms <br />4:1 downslope 21 ft. downslope berm <br />UDsloDe berm = <br />� Z.a <br />1y0 <br />Limiting_ Condition <br />4" inspection pipe <br />r-- 18" cover on top <br />DownsloDe bene 21 <br />12" cover on sides <br />(6" loamy cap & 6" topsoil) <br />Clean sand lift <br />Depth to Limiting <br />^—' <br />Absorption Width z7.o ---_ — ——-- <br />Note: <br />For 0 to 1% slopes, Absorption Width is measured from the Bedequally in bath directions. <br />For slopes }1%, Absorption Wdth is measured downhill from the upslope edge of the Bed. <br />Rock Bed: 21.0 'yd or *1.4= 29 ton <br />Mound Sand: 222 yd3 or *1.4= 310 ton <br />Loamy Cap: 78 yd or *1.4= 109 ton <br />Topsoil: 89 yd or *1.4= 125 ton <br />inches under pipe <br />calculation based on 3:1/4:1 slope from top of rockbe <br />6" deep <br />6" deep <br />