Laserfiche WebLink
Installer Summary <br />2250 gallon Septic tank (minimum) Tank options: none <br />7Uk Larger LMK WILn MULLIPLe LULFIp! La91Ki <br />1300 gallon Dose tank (minimum) at 25.49 gpi <br />36 GPM C 20 ft. of head, Pump required <br />7.6 inch swing on Demand float which translates to roughly 4.8 inches of float tether length <br />if time daring is required > 5.4 minutes ON time Et ®hours OFF time <br />20 inches from bottom of tank to "pump ON" float, or 12 inches to "timer ON" float <br />23 linches from bottom of tank to "Hi Level Alarm" or 33 inches to "Hi level alarm" if time dosed <br />30 ft. of 2.0 inch supply line with end feed manifold connection <br />(Tip: "top feed" manifold to control drainback) <br />16 inch, or 1.3 ft. Sand Lift Mound <br />10.0 ft. wide by 63.0 ft. long Rock bed <br />3 laterals 2.00 inch diameter 61.4 ft. long 3.0 ft. lateral spacing <br />7132 inch perfs 3.0 ft. perforation spacing <br />No Effluent filter Et alarm <br />3 clean out Et valve box assemblies <br />27.0 ft.Total sand ABSORPTION width (minimum) <br />0.0 ft. upslope and sideslope (sand beyond rockbed, minimum) <br />17,0 ft. Downslope (sand beyond rockbed, minimum) <br />Specific slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 9 It. upslope berm <br />3;1 sideslope 14 fideslope berms <br />3:1 downslope 30 ft. downslope berm <br />4" inspection pipe <br />18" cover on top <br />Upslope herrn I l 41 11 DownsloDe bene 30 <br />12" cover on sides <br />(6" ioaremy cap &. 6" topsoil) <br />1.3 11 Clean sand lift <br />Depth to Limiting <br />!_imrtirlg Condition --- ---------- <br />Absorption Width 127.0 <br />Note: <br />For 0 to 1% slopes, Absorptian Width is measured from the Bedequally in both directions. <br />For slopes a1%, Absorption Width is measured downhill from the upslope edge of the Bed. <br />Rock Bed: 21.0 yd or *1.4= 29 ton <br />Mound Sand: 208 yd or*1.4= 292 ton <br />Loamy Cap: 87 yd3 or *1.4= 122 ton <br />Topsoil; 100 yd or *1.4= 140 ton <br />6 inches under pipe <br />calculation based on 3:114:1 slope from top of rockbei <br />6" deep <br />6" deep <br />