Laserfiche WebLink
instructions: = =enter data 0 = adjust if desired 0 = computer calculated - DO NOT CHANGE! <br />1) =bedroom Type �I Residential System <br />i 75D GPD design flow <br />;} Yes Garbage disposal or pumped to septic 50% larger tank with multiple comp/tanks <br />Gal Septic tank (code minimum) 2250 Gal Septic tank (design size /LUG req'd) <br />1) F2250 <br />Tank options: none <br />5} 1.2 GPD/fe mound sand loading rate contour loading rate of12 req's a min 62.5 ft. long rockbed <br />it 16.0 ft rockbed width 62.5 ft rockbed length <br />i} 3.0 ft lateral spacing 3.0 ft perforation spacing (maximum of 3 for both) <br />end feed manifold connection <br />;} =laterals 60.5 feet long 21.0 perfs / lateral 63 perfs total <br />(1 /2 a perf means the first pert starts at the middle feed manifold) <br />�} 7132 inch perfs at =feet residual head gives 0.56 gpm flow rate per perforation <br />for this pert size 8 spacing, ft pipe size on line 12, max perfs/lateral = 30 line #8 must be less ?I<. <br />In) 4.0 doses per day (4 minimum) <br />1 I) F 188 gallons per dose (treatment volume) <br />2.00 5x <br />12} 2.00 inch diameter laterals must be used to meet "4x pipe volume" requirement <br />2.00 3x <br />13) 25 feet of 2.0 inch supply line leads to �galions of drainback volume <br />(Tip: "top feed" manifold to control the drainback) <br />14) 142 gallons TOTAL pump out volume (treatment + drainback) <br />is} <br />P36 <br />feet vertical lift from pump to mound laterals, leads to a: <br />G} GPM Ca 16 feet of head, Pump requirement (note: >50gpm may require an extra 3.6' of head) <br />17} F750 gal Dose tank (code minimum) 1250 gal Dose tank (design size / LUG req'd) at F 25.49 gpi <br />leads to a <br />18} 7.5 inch swing on Demand float, or timed dosing of5.3 min ON (confirm pump rate with drawdown <br />(this delivers Average flow, =70% of Peak design flow) 1 9 1hrs OFF test and adjust as necessary) <br />ig) 12 inches from bottom of tank to "Pump OFF" float <br />N) 20 inches from bottom of tank to "Pump ON" float, or FI <br />12 inches to "Timer ON" float if time dosed <br />>-i) 23 inches from bottom of tank to "Hi Level" float, or F 33 1 inches to "Hi Level" float if time dosed <br />22} 664 gallons reserve capacity (after High Level Alarm is activated) <br />0.45 gpd/ft' Absorption area Soil Loading Rate, which gives a mound ratio of [124] <br />(minimum) <br />(this must match the soil boring log) desired mound ratio <br />=percent site slope (0-20% range) =(% downslope site slope, if different than upstope) <br />18 inches, or 1.5 ft. to Redox or other limiting condition (need at least 12" to be a Type 1) <br />Treatment zone contains Tinches of 0% soil credit, and =inches of 50% soil credit. Giving a: <br />18 inch, or 1.5 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS I I I <br />27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />0.0 ft. upslope and sideslope <br />