My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Legal Docuements
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Excel Energy 2012-2013/Correspondence & MN Dept of Commerce - Mike Gaffron File Cabinet 1
>
Legal Docuements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/29/2021 10:43:05 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 7, 2013 <br /> Huntington Farm Homeowners'Association Members, <br /> Last week, it was discovered that the as-built location for structure 076-4, the first new <br /> transmission pole north of the substation on Xcel Energy substation property was constructed <br /> approximately 120 feet further north than intended and has resulted in inadequate operating <br /> clearance to the GRE 69 kV Line as constructed. A map indicating details is attached for <br /> reference. <br /> In order to place the structure where it was designed and intended to be constructed, Xcel Energy <br /> crews will construct a new concrete drilled pier foundation in the correct location on Xcel Energy <br /> property, move the steel pole to the new foundation, re-string conductor and shield wires to the <br /> substation termination structure. The remaining foundation will be removed to below grade and <br /> the surface area will be filled and restored. <br /> The new foundation and pole will be placed approximately 120 feet south of its current location <br /> and in compliance with the plans submitted to the Minnesota Public Utilities Commission on <br /> January 18, 2013 with updates provided on February 7 and March 22, 2013. A copy of these <br /> plans is attached for reference. <br /> Construction for the new transmission line on Huntington Farm Homeowners'Association <br /> property has been completed except for the removal of access mats, clean up and turf <br /> restoration, which is expected to be completed within the next 2 weeks. <br /> Access mats will remain in place on Xcel Energy substation property until the pole replacement <br /> work is completed sometime in the next 4-5 weeks. <br /> Please contact me should you have any questions regarding this matter. <br /> Sincerely, <br /> Chris Rogers <br /> Principal Siting and Land Rights Agent <br /> 612-330-6078, office <br /> 651-247-5531, cell <br /> Christopher.c.rogers a(�.xcelenergy.com <br /> Attachments: Pole location map, Plan and Profile <br />
The URL can be used to link to this page
Your browser does not support the video tag.