My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Excel & Minnesota Department of Commerence
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Excel Energy 2012-2013/Correspondence & MN Dept of Commerce - Mike Gaffron File Cabinet 1
>
Excel & Minnesota Department of Commerence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/29/2021 10:33:46 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Energy Facility Permitting <br /> ,... <br /> MINNESOTA 85 7th Place East,Suite 500 <br /> DEPARTMENT OF St. Paul, Minnesota 55101-2198 <br /> COMMERCE ph 651.296.4026 I fax 651.297.7891 <br /> \ i http://mn.gov/commerce/energyfacilities <br /> PERMIT COMPLIANCE FILING REVIEW <br /> PUC Docket No. E002/TL-11-223 <br /> Northern States Power Company, a Minnesota Corporation (Xcel Energy) filed compliance <br /> documents pertaining to the Route Permit issued by the Commission on April 6, 2012, for the <br /> Orono Substation Expansion and New 115 kV Transmission Line Project. <br /> The following documents were submitted in accordance with the HVTL Route Permit: <br /> Filing Permit Description e-Docket Document Date Filed <br /> Number Section(s) Number <br /> 1 4.1 Proposed resolution of 20136-88382-01 June 21, 2013 <br /> misplaced structure. <br /> Misplaced Structure on 115 kV Transmission Line <br /> On May 8, 2013, Xcel Energy informed the Commission that the first new transmission structure <br /> north of the Orono Substation (denominated as Structure 076-4) was constructed approximately <br /> 120 feet further north than intended.' The May 8th letter informed the Commission that, on <br /> advice of EFP staff, Xcel Energy would investigate options for resolving this issue and would <br /> seek input from neighboring landowners on their preferences. <br /> On June 21, 3013, Xcel Energy filed a letter with the Commission that: <br /> • explained how the error occurred and described procedures for reducing the potential for <br /> this type of error to occur in future projects; <br /> • described several alternatives to resolve the issue and identified Xcel Energy's preferred <br /> resolution of the error; and <br /> • summarized input Xcel had received from neighboring landowners.2 <br /> Section 4.1 of the Route Permit requires the permittee to file plan and profile information, <br /> including transmission structure specifications and locations shown on a map. With regard to <br /> changes in project design occurring after submission of a plan and profile, this section of the <br /> permit states: <br /> If the Permittee intends to make any significant changes in the plan and profile or the <br /> specifications and drawings after submission to the Commission, the Permittee shall <br /> notify the Commission at least five (5) days before implementing the changes. No <br /> changes shall be made that would be in violation of any of the terms of this permit. <br /> Xcel Energy,eDocket ID: 20135-86838-01 <br /> z Xcel Energy,eDocket ID: 20136-88382-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.