Laserfiche WebLink
wcduUn: rropa5ea Lot 3, tSIK 1 <br />Hole number: 3 <br />Date hole was prepared: 3/11/15 <br />Depth of hole bottom _12"_ inches, Diameter of hole 6" inches. <br />Soil data from test hole: <br />Depth, inches Soil texture <br />0-6" Dark Brown Loam 10yr4/2 <br />6"-12" Brown Loam10yr4/3 <br />Method of scratching side wall: Knife <br />Depth of gravel in bottom of hole 2 inches: <br />Date of initial water filling 3/11/15 depth of initial water filling 12 inches above the hole bottom <br />Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon <br />Maximum water depth above hole bottom during tests 6 inches <br />Time <br />Time <br />Depth <br />Drop in H2O <br />Perc Rate <br />10:49 <br />11:04 <br />6" <br />4.7 <br />31 <br />11:07 <br />11:22 <br />6" <br />4.6 <br />3.2 <br />11:27 <br />11:42 <br />6" <br />4.8 <br />3.3 <br />AVERAGE FERC. RATE 32 MPI <br />Percolation Test Data Sheet <br />Lic.#810 <br />Percolating test readings made by: Rusty Olson's Perc. starting at 10:35 A.M. On 3/12115 <br />Location: Proposed Lot 3, Btk 1 <br />Hole number: 4 <br />Date hole was prepared: 3111/15 <br />Depth of hole bottom _12"_ inches, Diameter of hole 6" inches. <br />