My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-2018 Septic Design
Orono
>
Property Files
>
Street Address
>
G
>
Gander Road
>
730 Gander Road - 04-117-23-43-0021
>
Septic
>
07-25-2018 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:14:47 PM
Creation date
9/29/2021 8:55:05 AM
Metadata
Fields
Template:
x Address Old
House Number
730
Street Name
Gander
Street Type
Road
Address
730 Gander Rd
Document Type
Septic
PIN
0411723430021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 0.0 ft. upslope and sidesLope <br />17.0 ft. Downslope <br />Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br />y) 4:1 upslope ratio 10 ft. upslope berm <br />o� 4:1 sideslope 17 ft. sideslope berms <br />i) 4:1 downstope 24 ft. downslope berm <br />2) Overall Dimensions <br />UDslooe bene <br />10.0 1 ft, wide by F62.51 ft. Long Rock bed <br />44 ft. wide by 97 ft. long Mound footprint <br />4" inspection pipe <br />18" cover on top <br />1� J 1� 1. DownslODe berm 24 <br />12" cover on sides <br />(6" loamy cap & 6" topsoil) <br />J 1.3I Clean sand lift <br />1.7 Depth to Limiting <br />i_:anitifig Condition - __--____ <br />Absoration Width f 27.0 <br />Note- <br />For 0 to 1%Slopes, Absorption Width is measured from the Bedequally in both directions. <br />For slopes >1%, Absorption Width is measured downhill from the tlpstope edge of the Bed <br />Rock Bed: <br />FEET t- by 62.5 lift. by inches under pipe, plus 20% gives 21 yd' or "1.4=29 ton <br />Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br />27.0 up + 94.6 downslope + 14.5 ends + 40.1 junder rock = 212 yd3 or "1.4= F296 ton <br />plus 20% <br />Loamy Cap: <br />®ft. by =ft. 6" deep, plus 20% gives <br />U,; Topsoil: <br />=yd' or *1.4= =ton <br />=ft. by =ft, 6" deep, plus 20% gives 95 yd' or "1.4= =ton <br />I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and taws. <br />Ende Septic Service C9206 11/27/2017 <br />signer Signature Company License# Date <br />Installer Summary <br />2500 gallon Septic tank (minimum) Tank options: Multiple tanks or compartments req'd <br />JVib td gef LdI IK wltll II0.RUIJle UJlf 1p/ talfRS <br />1250 Batton Dose tank (minimum) at 23.00 Bpi <br />47 GPM @=ft. of head, Pump required <br />8.9 inch swing on Demand float which translates to roughly 5.5 inches of float tether length <br />if time dosing is required --> 4.4 minutes ON time li =hours OFF time <br />25 inches from bottom of tank to "pump ON" float, or 16 inches to 'timer ON" float <br />28 inches from bottom of tank to "Hi Level Alarm" or 38 inches to "Hi level alarm" if time dosed <br />
The URL can be used to link to this page
Your browser does not support the video tag.