Laserfiche WebLink
Minnesota Pollution OSTP Mound Materials Worksheet UNIVFRS,TY <br />OF MINNESOTA <br />Control Agency <br />Project ID: v 04.20.2016 <br />A. Calculate Rock Volume : (Rock Below Pi e + Rock to cover i e ipe dic - r inch) ) X Bed Len th 12.D1 X Bed Width (2.B) = Volume ift') <br />6.00 n - 3.00 n) - 12 X 63.0 ft XL. 10.0 ft = 472.5 1t' <br />Divide ft- by 27 ft3/yd3 to calculate cubic ards: <br />472.5 ft' 27 = 17.5 7yd3 <br />Add 20% for constructability: 17.5 yd' X 1.2 = 21.0 yd= <br />For systems using other distribution media - see product registration for material required <br />B. Calculate Clean Sand Volume: <br />Volume Under Rock bed: Average Sand Depth x Medic Width x Medic Length = cubic feet <br />2.2 ]ft X 10.0 Ift X 1 63.0 Ift = F 1386.0 <br />For a Mound on a slope from 0-1% <br />Volume from Length = ((Upslope Mound Height - 1) X Absorption Width Beyond Bed X Media Bed Length) <br />ft - 1) X I X ft = <br />Volume from Width = ((Upslope Mound Height - 1 X Absorption Width Beyond Bed X Media Bed Width) <br />ft - 1) X X ft = <br />Total Clean Sand Volume: Volume from Length - Volume from Width - Volume Under Media <br />ft- ft - ft = ft' <br />For a Mound on a slope greater than 1% <br />Upslope Volume: ((Upslope Mound Height - 1) x 3 x Bed Length) - 2 = cubic feet <br />(( 3.5 ft - 1) X 3.0 ft X 63.0 ) - 2 = 236.3 ft' <br />Downslope volume: ((Downslope Height - 1) x Downslope Absorption Width x Media Length) - 2 = cubic feet <br />ft - 1) X 16.0 ft X 63.0 ) - 2 = 146t.b ft3 <br />Endslope Volume: (Downslope Mound Height - 1) x 3 x Media Width = cubic feet <br />( 3.9 ft - 1 ) X 3.0 ft X 10.0 7ft = 87.0 ft' <br />Total Clean Sand Volume: Upslope Volume . Downslope Volume . Endslope Volume - Volume Under Media <br />236.3 ft' _ 1461.6 ft' 87.0 ft' _ 1386.0 ft' = 3170.9 ft' <br />Divide tt' by 27 ft'/yd' to calculate cubic yards: I 3170.9 I ft- s 27 = 117.4 yd <br />Add 20% for constructability: 117.4 yd- X 1.2 = 140.9 yd, <br />C. Calculate Sandy Berm Volume: <br />Total Berm Volume (approx): ((Avg. Mound Height - 0.5 ft topsoil) x Mound Width x Mound Length) - 2 = cubic feet <br />( 3.7 0.5 )ft X 42.0 ft X 87.0 ) - 2 = 5846.4 ft3 <br />Total Mound Volume - Clean Sand volume -Rock Volume = cubic feet <br />5846.4 ft 3170.9 ft' 472.5 ft' = 2203.1 ft <br />Divide ft' by 27 ft'/yd'to calculate cubic yards: 2203.1 ft' 27 = 81.6 yd, <br />Add 20% for constructability: 81.6 yd' x 1.2 = 97.9 <br />yd' <br />D. Calculate Topsoil Material Volume: Total Mound Width X Total Mound Length X .5 ft <br />42.0 ft X 87.0 ft X 0.5 ft = 1827.0 ft' <br />Divide ft' by 27 ft'/yd'to calculate cubic yards: 1827.0 ft' e 27 = 67.7 yd} <br />Add 20. for constructability: 67.7 ydx 1.2 - 81.2 <br />yd' <br />