Laserfiche WebLink
Minnesota Pollution <br />OSTP Design Summary Worksheet UNIVERSITY <br />Control Agency OF MI N N ESOTA <br />Bed Design Summary <br />Absorption AreaW <br />Depth of sidewallin Code Maximum Bed Depth�in <br />Bed Width ==ft <br />Bed Length E=ft Designers Max Bed Depth�in <br />Mound Design Summary <br />Absorption Bed Area _ft <br />Bed Length 63.0 ft Bed Width 10.0 ft <br />Absorption Width 26.0 ft <br />Clean Sand Lift 2,0 ft Berm Width (0-1%)ft <br />Upslope Berm Width 12.0 ft Downslope Berm Width 20.0 ft Endslope Berm Width 12.0 ft <br />Total System Length g7,0 ft <br />Total System Width 42.0 ft Contour Loading Rate 12.0 galift <br />At -Grade Design Summary <br />Absorption Bed Width E== ft <br />Absorption Bed Lengthft System Finished Height �ft <br />Contour Loading Rategat/ft <br />Upslope Berm Widthft Downslope Berm Widthft <br />Endstope Berm WidthCit <br />System Length E=ft System WidthE=ft <br />Level ft Equal Pressure Distribution Summary <br />No. of Perforated Laterals <br />Perforation Spacing E=ft Perforation Diameter 7132 in <br />Lateral Diameter 2.00 in <br />Min. Delivered Volume gat Maximum Delivered Volume =i=gat <br />Non -Level and Unequal Pressure Distribution Summary <br />Elevation <br />Pipe Volume <br />Pipe Length Perforation Size <br />(ft) Pipe Size (in) <br />(gal/ft) <br />(ft) (in) Spacing (ft) Spacing (in) <br />Minimum Delivered Volume <br />Lateral 1 <br />Lateral 2 <br />gat <br />Maximum Delivered Volume <br />Lateral 3 <br />Lateral 4 <br />Lateral 5 <br />gat <br />Lateral <br />5. Additional Info for Type IV/Pretreatment Design <br />A. Calculate the organic loading <br />1. Organic Loading to Pretreatment Unit = Design Flow X Estimcted BOD in mg/L in the effluent X 8.35: 1,000,000 <br />gpd X <br />mg/L X 8.35: 1.000,000 = C=ibs BODiday <br />2. Type of Pretreatment Unit Being Installed: <br />3. Calculate Soil Treatment System Organic Loading: <br />BOD concentration after pretreatment = Bottom Area = lbs/day/ft' <br />mg/L X 8.35 _ 1.000,000 s <br />=ft' = E=lbs/day/ft` <br />Comments/Special Design Considerations: <br />I hereby certify that I have completed this <br />work in accordance with all applicable ordinances, rules and laws. <br />f ' <br />Joseph J Olosn <br />810 05/27/16 <br />(Designer) <br />(Signature) (License «) (Date) <br />