My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-2016 Septic Design
Orono
>
Property Files
>
Street Address
>
S
>
Somerset Lane
>
3010 Somerset Lane - 04-117-23-22-0029
>
Septic
>
05-27-2016 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:09:37 PM
Creation date
9/28/2021 4:12:04 PM
Metadata
Fields
Template:
x Address Old
House Number
3010
Street Name
Somerset
Street Type
Lane
Address
3010 Somerset La
Document Type
Septic
PIN
0411723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Basic Pump Selection Design <br />Minnesota Pollution Worksheet UNIVERSITY <br />Control Agency OF MINNESOTA <br />1. PUMP CAPACITY Project ID: v 04.20.2016 <br />Pumping to Gravity or Pressure Distribution: Pressure <br />1. If pumping to gravity enter the gatlon per minute of the pump: C�GPM f 10 - 45 gpm) <br />2. If pumping to a pressurized distribution system: 36.0 GPM <br />3. Enter pump description: <br />2. HEAD REQUIREMENTS <br />A. Elevation Difference 10 ft <br />between pump and point of discharge: <br />B. Distribution Head Loss: ft �7 <br />I <br />C. Additional Head Loss: E== ft roue to special eouipment, etc.) <br />Distribution Head Loss <br />Gravity Distribution = Oft <br />Pressure Distribution based on Minimum Average Head <br />Value on Pressure Distribution Worksheet: <br />Minimum Avera a Head Distribution Head Loss <br />1ft 5ft <br />2ft 6ft <br />5ft 1 Oft <br />a, e <br />nn.•�en<r <br />H. Total Head requirement is the sum of the Elevation Difference (Line A), the Distribution Head Loss (Line B), Additional Head Loss (Line C), and <br />the Supply Friction Loss (Line G ) <br />10.0 ft 5.0 ft - E=ft - 3.9 ft = 18.9 ft <br />3. PUMP SELECTION <br />A pump must be selected to deliver at least 36.0 GPM (Line 1 or Line 2) with at teast 1$,9 feet of total head. <br />Comments: <br />Table J. Friction Loss in Plastic Pipe per 100ft <br />Flow Rate <br />Pipe Diameter (inches) <br />D. 1. Supply Pipe Diameter: 2.0 in <br />iGPM) <br />1 1.25 1 <br />1.5 2 <br />1.7 <br />2.4 <br />10 <br />9.1 3.1 <br />1.3 0.3 <br />12.9 <br />12 <br />12.8 4.3 <br />1.8 0.4 <br />40 <br />14 <br />17.0 5.7 <br />2.4 0.6 <br />16 <br />21.8 7.3 <br />3.0 0.7 <br />18 <br />9.1 <br />3.8 0.9 <br />6.1 <br />Friction Loss = 3.32 ft per 100ft of pipe <br />55 <br />H. Total Head requirement is the sum of the Elevation Difference (Line A), the Distribution Head Loss (Line B), Additional Head Loss (Line C), and <br />the Supply Friction Loss (Line G ) <br />10.0 ft 5.0 ft - E=ft - 3.9 ft = 18.9 ft <br />3. PUMP SELECTION <br />A pump must be selected to deliver at least 36.0 GPM (Line 1 or Line 2) with at teast 1$,9 feet of total head. <br />Comments: <br />1.1 4.6 <br />1.1 <br />D. 1. Supply Pipe Diameter: 2.0 in <br />25 <br />30 <br />16.8 6.9 <br />23.5 1 9.7 <br />1.7 <br />2.4 <br />2. Suppty Pipe Length: 95 ft <br />35 <br />12.9 <br />3.2 <br />40 <br />16.5 <br />4.1 <br />E. Friction Loss in Plastic Pipe per 100ft from Tabte I: <br />45 <br />20.5 <br />5.0 <br />50 <br />6.1 <br />Friction Loss = 3.32 ft per 100ft of pipe <br />55 <br />7.3 <br />F, Determine Equivalent Pipe Length from pump discharge to soit dispersal area discharge <br />60 <br />65 <br />8.6 <br />point. Estimate by adding 25% to supply pipe length for fitting loss. Supply Pipe Length <br />70 <br />10.0 <br />(D.2) X 1.25 = Equivalent Pipe Length <br />11.4 <br />75 <br />13.0 <br />95 ft X 1.25= 118.8 ft <br />g5 ! <br />16.4 <br />20.1 <br />G. Calculate Supply Friction Loss by multiplying Friction Loss Per 100ft (Line E) by the Equivalent Pipe Length (Line F) and divide by 100. <br />Supply Friction Loss = <br />3.32 ft per 100ft X 118.8 ft t 100 <br />= 3.9 ft <br />H. Total Head requirement is the sum of the Elevation Difference (Line A), the Distribution Head Loss (Line B), Additional Head Loss (Line C), and <br />the Supply Friction Loss (Line G ) <br />10.0 ft 5.0 ft - E=ft - 3.9 ft = 18.9 ft <br />3. PUMP SELECTION <br />A pump must be selected to deliver at least 36.0 GPM (Line 1 or Line 2) with at teast 1$,9 feet of total head. <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.