Laserfiche WebLink
No Tanks City of Orono Septic Plan Review <br />10 X 38 Rock Bed Reviewer! �� <br />All work shall be done in full compliance <br />Mound repair Only with all applicable septic and zoning code. <br />® Joseph Olson D.B.A. <br />Rusty 4lson's--Soil and Percolation Testing <br />Joseph J. Olson--MPCA License # 810 <br />11481 Riverview Rd. NE, Hanover, MN 55341 <br />(763) 498-8779 Fax (763):498-8290 <br />November 21. 2017 <br />Danielle Steele <br />1050 Bayside Road <br />Orono, Hennepin County <br />To whom it may concern <br />I was contacted by Danielle Steele to design the repair for the failing mound system at 4050 Bayside Road. <br />1n the city of Orono. The results of the inspection and design are as follows - <br />Soil borings indicated that the existing rock bed does not meet the three -root separation to the periodically <br />saturated soils. Therefore. the solution is to remove the existing rocs: been and any of the sand material under the rot k <br />that is not clean. Then replace it with clean sand to the proper elevation. <br />The original soils under the uphill side of the rock bed at the south end are at elevation_ -87.2. The sysrent <br />was original installed with 1.0 feet of sand under the uphill side of the rock bed. The bottom of the new rock bed <br />must be placed at the elevation of 90.2. Due to less than 12 inches to the periodically saturated soils on the south <br />side of the rock bed this system is classified as a type III sy=stern. <br />I <br />The existing tanks may be used upon approval of the local inspector. The electrical box at the lift station <br />must be replaced. <br />i <br />There is one rock bed 38 feet in length. This will take approximately 13 cubiti yards of rock with six inches <br />of rock. <br />• The clean sand required will be approximately 52 cubic yards. This number s aa) vary due to the fact that. <br />We don't know how much of the sand will be removed until the rock bed is removed.1 <br />oai <br />t� The sandy loam cap will require approximately 12 cubic yards. <br />The laterals will take 108 lineal feet of Lwo-inch pipe with '.v -inch perforatiotrs_ Clean outs must be instalicd <br />on the end of the laterals. <br />The topsoil required will be approximately i I cubic yards. <br />/1 To add a fourth bedroom, it will take the additional amount of materials. <br />Page 1 <br />