My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/07/2018 Septic Design
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Court
>
4330 Lakeview Court - 06-117-23-43-0017
>
Septic
>
10/07/2018 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:06 PM
Creation date
9/28/2021 3:47:57 PM
Metadata
Fields
Template:
x Address Old
House Number
4330
Street Name
Lakeview
Street Type
Court
Address
4330 Lakeview Ct
Document Type
Septic
PIN
0611723430017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
instructions: = =enter data = adjust if desired = = computer calculated - DO NOT CHANGE! <br />)) =bedroom Type Residential System <br />21 450 GPD design flow <br />3) Na Garbage disposal or pumped to septic <br />4) -1000 Gal Septic tank (code minimum) F20001Gat Septic tank (design size / LUG regd) <br />Tank options: none <br />s) GPD/ft2 mound sand loading rate contour loading rate of712-1req's a min 37.5 ft. long rockbed <br />1.2 <br />e) 10.0 ft rockbed width 38.0 ft rockbed length <br />z) 3.0 ft lateral spacing 3,0 ft perforation spacing (maximum of 3 for both) <br />Fended manifold connection <br />fe <br />8) ! 3 ]laterals 13.0 36.0 feet long perfs / lateral 39 perfs total <br />(1 /2 a perf means the first perf starts at the middle feed manifold) <br />9)7/32 inch perfs at =feet residual head gives 0.56 gpm flow rate per perforation <br />for this perf size it spacing, Er pipe size on line 12, max perfs/lateral = 30 line #8 must be less --> Ok <br />10) 4.0 doses per day { 4 minimum) <br />) f 1 113 gallons per dose (treatment volume) <br />2.00 5x <br />)2) 2.00 inch diameter Laterals must be used to meet "4x pipe volume" requirement <br />2.00 3x <br />)3) =feet of 2.0 Inch supply line leads to12 gallons ofdrainback volume <br />(Tip: "top feed" manifold to control the drainback) <br />)4) 125 gallons TOTAL pump out volume (treatment + drainback) <br />)s) 16 feet vertical lift from pump to mound laterals, leads to a: <br />6,) 22 GPM C 23 feet of head, Pump requirement (note: >50gpm may require an extra 3-6' of head) <br />17) 500 gal Dose tank (code minimum) 1000 gal Dose tank (design size / LUG req'd) at aEgpi <br />leads to a <br />18) =inch swing on Demand float, or timed dosing of5.7 min ON (confirm pump rate with drawdown <br />(this delivers Average flow, =70% of Peak design flow)Bhrs OFF test and adjust as necessary) <br />ie) F 12 Inches from bottom of tank to "Pump OFF" float <br />10) 17 inches from bottom of tank to "Pump ON" float, or 12 inches to "Timer ON" float if time dosed <br />sit 20 linches from bottom of tank to "Hi Level' float, or 30 inches to "Hi Level" float if time dosed <br />22) 500 gallons reserve capacity (after High Level Alarm is activated) <br />23) 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of2.7 (minimum) <br />(this must match the soil boring log) desired mound ratio 2.7 <br />24) =percent site slope (0-20% range) =(% downslope site slope, if different than upslope) <br />25) F12 inches, or 1.0 ft. to Redox or other limiting condition (need at least 12" to be a Type f) <br />Treatment zone contains inches of 0% soil credit, and ®inches of 50% soil credit. Giving a: <br />26) 24 inch, or 2.0 ft. Sand Lift Mound CRITICAL FOR FUTURE C€RTIFICATIONS!II <br />27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />281 0.0 ft. upslope and sideslope <br />
The URL can be used to link to this page
Your browser does not support the video tag.