Laserfiche WebLink
Installer Summary <br />2250 gallon Septic tank (minimum) Tank options: none <br />avx Larger tanrc wiLn muLupte comer Lanres <br />1250 gallon Dose tank (minimum) at 25.49 gpi <br />36 GPM @ 23 ft. of head, Pump required <br />8.2 inch swing on Demand float which translates to roughly 5.1 inches of float tether length <br />if time dosing is required —F3.8 5.8 minutes ON time Et hours OFF time <br />20 inches from bottom of tank to "pump ON" float, or 12 inches to "timer ON" float <br />23 linches from bottom of tank to "Hi Level Alarm" or 1 33 linches to "Hi level alarm" if time dosed <br />125 ft. of 2.0 inch supply line with end feed manifold connection <br />(Tip: "top feed" manifold to control drainback) <br />20 inch, or 1.7 ft. Sand Lift Mound <br />10.0 ft. wide by 63.0 ft. long Rock bed <br />3 laterals 2.00 inch diameter 61.0 ft. long =ft. lateral spacing <br />7/32 inch perfs 3.0 ft. perforation spacing <br />No Effluent filter lit alarm <br />3 clean out Ft valve box assemblies <br />27.0 ft.Total sand ABSORPTION width (minimum) <br />0.0 Ift. upslope and sideslope (sand beyond rockbed, minimum) <br />17.0 ft. Downslope (sand beyond rockbed, minimum) <br />Specific slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 11 ft. upslope berm <br />3:1 IsidesLope 14 ft. sideslope berms <br />4:1 downslope 26 ft. downslope berm <br />i. oslol7e berm 11 <br />I 1.7 <br />_ 1.3 <br />limiting rld <br />Coittc�n <br />4" inspection pipe <br />r— 18" cover on top <br />Downslope berm 26 <br />12" carver on sides <br />(6" loamy cap & 6" topsoil) <br />Clean sand lift <br />Depth to limiting <br />-------------- <br />Absorption - Width z7.0 ---"-'_--�--�----._�..__� <br />Date: <br />For 0 to 1% slopes, Absorption Width is measured from the Bedequally in both directions. <br />For slopes >1%, Absorptfon Wdth is measured downhill from the upslope edge of the Bed. <br />Rock Bed: 21.0 yd or*1.4= 29 ton <br />Mound Sand: 261 yd or *1.4= 366 ton <br />Loamy Cap: 84 yd' or *1.4= 118 ton <br />Topsoil: 96 yd or *1.4= 134 ton <br />inches under pipe <br />calculation based on 3:1/4:1 slope from top of rockbe <br />6" deep <br />6" deep <br />