My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-18-2019 Septic Plans
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
185 Bayside Trail - 06-117-23-22-0028
>
Septic
>
10-18-2019 Septic Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:12 PM
Creation date
9/28/2021 8:49:33 AM
Metadata
Fields
Template:
x Address Old
House Number
185
Street Name
Bayside
Street Type
Trail
Address
185 Bayside Tr
Document Type
Septic
PIN
0611723220028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joseph Olson D.B.A. <br />Rusty Olson's--Soil and Percolation Testing <br />Joseph J. Olson--MPCA License #810 <br />11481 Riverview Rd. NE, Hanover, MN 55341 <br />(763) 498-8779 Fax (763) 498-8290 <br />October 18, 2019 <br />Lecy Brothers Homes <br />185 Bayside Trail <br />Orono, Hennepin County <br />This on-site Sewage Treatment System is designed for a Type 1, five -bedroom home in accordance with <br />the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br />The periodically saturated soils were located at 12-20 inches (mottled soil). Due to the periodically <br />saturated soils, a pressurized mound system with 6 inches of rock will need to be installed to treat the septic <br />effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. This system <br />is designed with 6 inches of rock. <br />A 2250 -gallon septic tank is designed for this site. All tanks need to be insulated if there is less than two <br />feet of cover over the top of the tanks. Clean outs must be installed on the end of the laterals for <br />maintenance. <br />The supply line under the driveway must be insulated and sleeved. <br />Use 7132 -inch perforations on the laterals. <br />A 1250 -gallon pumping chamber will need to be installed to lift the effluent to the treatment area. The <br />power supply and switches must be located outside the manhole and pumping chamber in a weatherproof <br />enclosure. A warning device must be installed with light and sound devices; this is in case of a pump <br />failure. A flow measurement device must be installed. Including but not limited to a water meter, event <br />counter, running time clocks or electronically controlled dosing. <br />Keep all heavy equipment off of the Proposed treatment areas before, during and after construction. <br />The area around both sites must be fenced off by the contractor before any construction begins. <br />With proper installation and maintenance, this system should have no problem in treating septic effluent <br />effectively. Nothing other than gray water, (laundry, showers, etc.) Human water and toilet tissue should be <br />disposed of into the septic tanks. Garbage disposals are not recommended. Iron filters cannot Eo into this <br />system. Additives must not be used they may cause harmful damage to your septic system. It is <br />recommended that you pump the septic tanks every two years. <br />Sine y, <br />Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.