My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Environmental Assessments
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
Environmental Assessments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 2:02:42 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IWith the Xcel Energy Proposed Route direct impacts to Baker Park Reserve would be replacement <br /> of Structure 076 on the existing Xcel Energy Line 0831;indirect impact would be visual,although <br /> most likely limited to the western portion of the Project. <br /> I <br /> Depending upon the setback required from public road ROW,discussed further in Section 5.8,the <br /> U Baker <br /> Park Reserve Alternative would be centered either 10 or 30 feet outside the U.S. Highway 12 <br /> ROW and require an acquisition of an easement of 47.5 and 67.5 feet in width. Low-growing <br /> vegetation would be allowed to repopulate the easement after the line is constructed,but trees would <br /> not be allowed to re-establish within the easement. Under this alternative approximately 0.6 to 0.9 <br /> I <br /> acres of trees would be cleared,depending upon the location of the centerline in relation to <br /> MnDOT ROW(Xcel Energy,personal communications,November 16 and 28,2011). The route in <br /> this area would not cross any of the recreational paths,but would be visible to users of the park. <br /> I More detailed information on vegetation impacts in provided in 5.14. Neither route would impact <br /> the Park Gun Club. <br /> I Mitigation Measures <br /> The Xcel Energy Proposed Alternative would not directly impact recreational resources. <br /> I ' The primary mitigation strategy to minimize recreation impacts is to minimize the amount of tree <br /> clearing required and to shield the route from recreational users of the Baker Park Reserve. The <br /> route for the Baker Park Reserve Alternative has been designed to overlap right-of-way with <br /> IMnDOT to minimize the amount of tree clearing required. <br /> As with any landowner,Xcel Energy would be required to compensate Three Rivers Park District or <br /> I otherwise mitigate for the loss of vegetation and park land. Three Rivers Park District Policy XII <br /> states diversion of Park District property must be in the best interest of the Park District and where <br /> all other alternatives have been exhausted,and where diversion poses no threat to the Park District <br /> I natural or recreation resources. Land and Water Conservation Fund rules and regulations may apply <br /> to the proposed easement area. Property acquired and/or developed using Land and Water <br /> Conservation Funds may not be wholly or partly converted to other than public outdoor recreation <br /> Iuses without the approval of National Park Service pursuant to Section 6(f)(3) of the Land and <br /> Water Conservation Fund Act and associated regulations.The conversion provisions of Section <br /> 6(f)(3),36 CFR Part 59,and these guidelines apply to each area or facility for which Land and Water <br /> Conservation Fund assistance is obtained,regardless of the extent of participation of the program in <br /> I <br /> the assisted area or facility and consistent with the contractual agreement between National Park <br /> Service and the State (Three Rivers Park District,personal communication,November 23,2011). <br /> I <br /> 5.10 Land Based Economies <br /> Land use and land cover in the project area consist primarily of rural residential,undeveloped <br /> Iwetland and woodland,transportation and regional parkland. <br /> While Hennepin County does have a strong agricultural base,the Project Area does not contain any <br /> I <br /> cultivated lands or pastures. No impacts to Agricultural uses are anticipated. <br /> There are no federal, state,or locally designated forests or commercial logging operations located <br /> within the Project location. Although there are forested areas along both routes, there is no forest <br /> I <br /> production in the Project location. No impacts to forestry are anticipated from the Project. <br /> Vegetation clearing is discussed in Section 5.14. <br /> IEnvironmental Assessment <br /> PUC Docket E002/TL-11-223 Page 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.