My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Environmental Assessments
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
Environmental Assessments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 2:02:42 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> 3 DESIGNATED ROUTE <br /> IThe approved route is shown on the official route maps attached to this permit and further <br /> designated as follows: <br /> IThe transmission line route exits the new Potato Lake Substation in Section 21 of Arago <br /> Township along U.S. Highway 71 and proceeds south paralleling U.S. Highway 71 for <br /> approximately 1.5 miles to 230th Street(Northern Pine Road); east along 230th Street for <br /> I approximately 1.5 miles to 141st Avenue; south approximately 1 mile along 141st Avenue to <br /> County Highway 18; then east paralleling County Highway 18 for approximately 3.25 miles to <br /> County Highway 4 and a new three-way switch on the existing Mantrap Sub Tap 34.5 kV line in <br /> I both section five of Henrietta Township and section 32 of La e Emma Township along County <br /> Highway 4. <br /> I3.1 Route Width and Alignment <br /> The designated route will be limited to 300 feet in , "•th as depicted on the attached Official <br /> Route Maps. This width will provide the Pe •;,F� •,fle j' ility for minor adjustments of the <br /> Ispecific alignment or right-of-way to acco :s date,an.• er requests and unforeseen <br /> conditions. The final alignment(i.e.,pe n t and maintained rights-of-way)will be located <br /> within this designated route unless othe , .ut h ized below. <br /> The designated route,as shown on the alta d aerial photos anticipates an alignment that would <br /> g <br /> follow two to five feet outsideexistin�g road rights-of-way (Count ighway 4, County Highway <br /> I <br /> 18, 141st Street, 230th Str-et and U.S. Highway 71) . eplace distribution structures and follow <br /> Itasca-Mantrap's existing istrion line right-o y •ng . Highway 71, and that <br /> minimizes the overa .• - tial i acts relati • to th ct• dentified in Minn. R. 7850.4100, <br /> I as evaluated in the enviro i 'review and • '-'1 _ :ocesses. Consequently,this permit <br /> anticipates thate actual r ht-of-way e ,�y conform to this alignment unless changes <br /> are requested by individu andowner unforeseen conditions are encountered, or are otherwise <br /> I provided for by this e <br /> pe it. Any align nt mo• ications within this designated route shall be <br /> located so as to haveomparable overallr'' , ' relative to the factors in Minn. R. 7850.4100 as <br /> does the alignment identified in this permit, and shall be specifically identified in, and approved <br /> as,part of the Plan and Profile submitted pursuant to Part 4.1 of this permit. <br /> Route width variations outside the designated route may be allowed for the Permittee to <br /> I overcome potential site specific constraints. These constraints may arise from any of the <br /> following: <br /> I 1) Unforeseen circumstances encountered during the detailed engineering and design <br /> process. <br /> I2) Federal or state agency requirements. <br /> 3) Existing infrastructure within the transmission line route, including but not limited to <br /> I roadways,railroads, natural gas and liquid pipelines,high voltage electric transmission <br /> lines, or sewer and water lines. <br /> 1 November 2010 Page l 7 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.