My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Xcel Orono Substation Easement Acquisition 2012
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
Xcel Orono Substation Easement Acquisition 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filed in Fourth Judicial District Court <br /> 11/2/2012 2:22:13 PM <br /> Hennepin County Civil,MN <br /> composed of galvanized steel, the height of which will be range from 70 to 90 feet, with the <br /> spans between the structures ranging from 300 to 500 feet; and construction of single-pole cross <br /> arm Y-frame structures composed of galvanized steel, the height of which will range from 70 to <br /> 90 feet, with the spans between the structures ranging from 300 to 500 feet along with associated <br /> facilities necessary for connection of the transmission line at the substation (collectively, the <br /> "Facilities"). The Facilities include all work and equipment necessary to establish and maintain <br /> the aforedescribed transmission line. <br /> 6. The Project is necessary in order to replace and expand an existing 69 kV Orono <br /> Substation with an expanded 115 kV substation at the same location and to connect the new 115 <br /> kV line with the Company's current facilities, which will allow the substation to serve electric <br /> load in the area. Thus, the Facilities are necessary and will serve a public use and purpose. <br /> 7. To accomplish the foregoing public use and purpose of constructing the Project, it is <br /> reasonably necessary and convenient for Petitioner to acquire by exercise of the power of eminent <br /> domain perpetual and irrevocable easements and rights-of-way to survey, construct, operate, <br /> maintain, use, upgrade, rebuild, relocate or remove a transmission line facility with one or more <br /> circuits, with all towers, structures, poles, foundations, crossarms, cables, wires, guys, supports, <br /> counterpoises, fixtures, and equipment related to said transmission line facility, together with <br /> communication equipment relating to the operation of such transmission line facility through, over, <br /> under, and across the lands described in Exhibit A, attached hereto and made a part hereof as <br /> though fully set forth at this point. The easement rights to be acquired by Petitioner are specifically <br /> described in Exhibit B,attached hereto and made a part hereof as though fully set forth herein. <br /> 8. The owners and occupants of the lands described in said Exhibit A shall have the <br /> full use and enjoyment of the easement areas and rights-of-way, so long as said use and enjoyment <br /> Xcel/Orono Line-Petition <br /> 5255799v1—November 2,2012-Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.