My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EQB & MN Rules
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
EQB & MN Rules
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 11:51:38 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the GRE 69 kV transmission line are wood single pole structures with heights of <br /> approximately 60 feet. <br /> 91. The installation of the transmission line would require tree clearing within an <br /> approximately 75-foot right-of-way.88 <br /> 92. Although the double-circuit structures are taller the use of double-circuit structures <br /> minimizes the number of structures and the width of right-of-way needed for the <br /> transmission portion of the project.89 <br /> 93. The city of Orono has requested that transmission structures be finished in light <br /> colors rather than dark colors.90 <br /> 94. The substation would include appropriate and sufficient lighting within the <br /> substation area in the event of an emergency during low light or night time <br /> conditions. During normal operation all of the substation lights will be left off and <br /> the substation will be dark, unless required by local units of government for other <br /> purposes such as security. During emergencies lights would be needed to facilitate <br /> the safety of personnel if work occurs in low light or after sunset; routine <br /> maintenance work is typically scheduled during daytime hours. Transmission <br /> structures are not lit.91 <br /> 95. The city of Orono has requested that all substation lighting be shielded and <br /> downward-facing so that sources of light will not be visible from off-site.92 <br /> 96. The project would be visible to residents in the project area as well as those <br /> travelling through along U.S. Highway 12 and Hennepin County Road 616th Avenue <br /> North.93 <br /> 97. Xcel Energy would replace the existing 0.1 acre Orono Substation with a new <br /> substation with a fenced area of approximately 1.2 acres. The new substation <br /> would contain approximately eight pieces of electrical equipment and a new <br /> structure to house electrical control panels. The height of the new equipment would <br /> be approximately 13-18 feet, with several steel deadend structures approximately 67 <br /> feet in height and two shield poles approximately 100 feet in height. Installation of <br /> the expanded substation would also entail removal of scattered pockets of existing <br /> trees and other vegetation west and north of the existing substation location.94 <br /> 88 Ex. 12 at p.24(EA) <br /> 89 Ibid.at p.25 <br /> 9°Ex.22(Hearing Comments,City of Orono) <br /> 91 Ex. 12 at p.25 (EA) <br /> 92 Ex.22(Hearing Comments, City of Orono) <br /> 93 Ex. 12 at p.24(EA) <br /> 94 Ibid.,and Ex. 17,at Schedule 11 (Sedarski Direct) <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.