Laserfiche WebLink
the new transmission line route would exit an expanded Orono Substation, head north for 866 feet <br />as a double circuit line and then turn to the northwest along the southern edge of the BNSF railroad <br />right-of-way for approximately 1,205 feet to the existing 115 kV transmission Line 0831. At this <br />point, the Project would replace three existing transmission structures and approximately 1,030 feet <br />of single circuit 115 transmission Line 0831with two new structures and approximately 1,095 feet of <br />single circuit 115 kV transmission line, re-routing the existing line off of two residential parcels and <br />onto adjacent Hunt Farm Home Owners Association property adjacent to the BNSF railroad. A <br />new double -circuit corner structure would connect the single- and double -circuit portions of the <br />project. The Project would also install fiber optic ground wire along the entire length of the Project <br />(Xcel Energy, June 7, 2011). <br />Xcel Energy proposed the route because it believed that the proposed route best met the following <br />primary objectives: <br />• Maximize use of existing Xcel Energy Property; <br />• Minimize land use impacts by routing along transportation corridors and existing <br />distribution and transmission lines to reduce the amount of new right-of-way required; <br />• Minimize land use impacts by routing along natural corridors, field line, and property lines, <br />where an existing corridor (e.g. fence line, drainage ditch, access road) is present; <br />• Minimize use of new right-of-way; <br />• Minimize impacts to residences; <br />• Minimize impacts to public resources, including Baker Park Reserve; and <br />• Minimize impacts to environmental and sensitive resources. Jbid.) <br />Baker Park Reserve Route Alternative <br />The application identified two routes that crossed portions of the Baker Park Reserve; these were <br />ultimately rejected by Xcel Energy in favor of the Proposed Route. During the scoping process, <br />members of the public requested further evaluation of a route alternative that minimized impacts to <br />private property by shifting the route burden to public lands. The Baker Park Reserve Alternative to <br />be evaluated in the EA is the same as Alternative Route 2 described in Appendix G of the Route <br />Permit Application. The Baker Park Reserve Alternative follows the same route as the Proposed <br />Route for the first 866 feet out of the substation, but continues northward for approximately 326 <br />feet across the BNSF Railroad, U.S. Highway 12, and an existing Xcel Energy distribution line. <br />Upon exiting U.S. Highway 12 right-of-way, the route enters the Three Rivers Park District's Baker <br />Park Reserve. From here the route continues westerly approximately 974 feet across Baker Park <br />Reserve property connecting to existing Xcel Energy 115 kV transmission Line 0831. The route <br />would then cross back over to the south side of U.S. Highway 12. As with the Xcel Energy <br />Proposed Route described above this alternative would also include the relocation of transmission <br />line 0831. The total length of this alternative with the relocation of Transmission Line 0831 is <br />approximately 0.6 miles. <br />3.4 Alternatives Proposed but not Evaluated in Detail <br />During the scoping process, four site alternatives to expanding the Orono Substation were proposed <br />(Department of Commerce, September 7, 2011b). None of the proposed alternative substation sites <br />was chosen for further evaluation in the EA. <br />Environmental Assessment <br />PUC Docket E002/TL-11-223 Page 7 <br />