My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�& XcelEnergya <br />March 17, 2011 <br />Dt. Butl W. Haar <br />Executive Secretary <br />Minnesota Public Utilities Commission <br />121 Seventh Place East, Suite 3.50 <br />5t. Paul, MN 55101 <br />414 Nicollet Mall <br />Minneapolis, Minnesota 55401-1993 <br />---Via Electronic E'IWYW <br />Re: Notification of Intent to File Route Permit Application Cinder the Alternative <br />Permitting Process for the <br />Proposed Orono Substation Expansion and Transmission Line Project <br />Dear Dr. Haar: <br />In accordance with Minnesota Rule 7850.2800, Subpart 2, Northern States Power Company, a <br />Minnesota corporation ('Keel Energy), hereby notifies the Minnesota Public Utilities Commission <br />(PUC) of its intent to submit an application for a route permit for the Orono Substation Expansion <br />and Transinission lane Project (Project) pursuant to the alternative permitting procedures in <br />Minnesota Rules 7850.2800 to 7850.3700. <br />The proposed Project includes rebuilding the existing 69 kilovolt OM Orono Substation to 115 kV <br />and constructing up to one mile of new double circuit 115 kV transmission line to connect the <br />planned substation to existing 115 kV transmission Line 0831, located in the City of Orono, <br />Hennepin County, Minnesota. The Project is needed to increase the operating voltage f -om 69 kV <br />to 115 kV which will improve local and system reliability, reduce the tisk of overloads, and allow for <br />additional load growth in the future. <br />Xcel Energy plans to file the application in April 2011 and will work with PUC and Office of Energy <br />Security staff to address any questions and/ot comments in order to expedite application acceptance <br />and completion of the environmental assessment. <br />If you have questions, please contact me at (612) 330-6435, <br />S' cphCG. <br />, 1 <br />se Sedarsld <br />Senior Permitting Analyst <br />cc: Deborah Pile, Office of Energy Security <br />Bob Cupit, Minnesota Public Utilities Commission <br />Timothy G. Rogers, Xcel Energy <br />Paul J. Lehman, Xcel Energy <br />Christopher B. Clark, Xcel Energy <br />
The URL can be used to link to this page
Your browser does not support the video tag.