Laserfiche WebLink
wetland, respectively. The Proposed Route will affect approximately 2 acres more of <br />wetlands than Alternative Route 2 assuming a 75 -foot -wide route width in each route; <br />• Except for replacing existing transmission Structure 076 which is located within existing <br />right-of-way on Baker Park Reserve property, the Proposed Route is outside of the <br />Baker Park Reserve property. Three of the four Alternative Routes enter the Baker Park <br />Reserve Property and would require new right-of-way, creating new impacts; <br />• Except for the existing Line 0831 conductors, the Proposed Route does not cross the <br />BNSF railroad, U.S. Highway 12 or the Metropolitan Council's sewer line, however three <br />of the four Alternative Routes cross these infrastructures; and <br />• Xcel Energy is in discussions with two private landowners to move the portion of <br />existing Line 0831, that is on their respective residential properties, north onto HFA <br />land. Relocating this portion of Line 0831 is only associated with the Proposed Route. <br />None of the Alternative Routes would relocate existing transmission facilities off <br />residential property. <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 64 <br />