My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.1.4 Transmission Construction Procedures <br />Construction will begin after federal, state, and local approvals are obtained, property and rights-of- <br />way are acquired, soil conditions are established and final design is completed. The precise timing of <br />construction will take into account various requirements that may be in place due to permit <br />conditions, system loading issues, material procurement and available workforce. <br />Construction will follow standard construction and mitigation practices, including best management <br />practices ("BMPs") that were developed from experience with past transmission facility projects as <br />well as any specific conditions identified in the Route Permit. These practices address right-of-way <br />clearance, staging, erecting transmission line structures, and stringing transmission lines. <br />Construction and mitigation practices to minimize impacts will be developed based on the proposed <br />schedule for activities, permit requirements, prohibitions, maintenance guidelines, inspection <br />procedures, terrain, and other factors. In some cases, activities or schedules are modified to <br />minimize impacts on sensitive environments. <br />Transmission line structures are generally designed for installation at existing grades. Typically, <br />structure sites with 10 percent or less slope will not be graded or leveled. Sites with more than 10 <br />percent slope will have working areas graded level or fill brought in for working pads. If the <br />landowner permits, it is preferred to leave the leveled areas and working pads in place for use in <br />future maintenance activities, if any. If permission is not obtained, the site is graded back to its <br />original condition to the extent possible and imported fill is removed. <br />Typical construction equipment used on a project consists of tree removal equipment, mowers, <br />cranes, backhoes, digger -derrick line trucks, track -mounted drill rigs, dump trucks, front end loaders, <br />bucket trucks, bulldozers, flatbed tractor -trailers, flatbed trucks, pickup trucks, concrete trucks, and <br />various trailers. Many types of excavation equipment are set on wheel or track -driven vehicles. <br />Poles are transported on tractor -trailers. Staging areas are often established for a project. Staging <br />involves delivering the equipment and materials necessary to construct the new transmission line <br />facilities. The materials are stored at staging areas until they are needed for a project. <br />Staging areas may also be required for additional space for storage during construction. To the <br />extent possible, Xcel Energy will use the existing Orono Substation site or other nearby Xcel Energy <br />substation sites as staging areas for the Project. These areas will be selected for their location, <br />access, security, and ability to efficiently and safely warehouse supplies. If needed, any temporary <br />staging areas outside of the transmission line right-of-way or at non-Xcel Energy sites will be <br />obtained through rental agreements. <br />Access to the transmission line right-of-way corridor is made directly from existing roads or trails <br />that run parallel or perpendicular to the transmission line right-of-way. In some situations, private <br />field roads or trails are used. Existing access roads may be upgraded or new roads may be <br />constructed where necessary to accommodate the heavy equipment used in construction, including <br />cranes, cement trucks and hole drilling equipment. New access roads may also be constructed when <br />no current access is available or the existing access is inadequate to cross roadway ditches. To the <br />extent possible, these activities are coordinated with the owner of the property affected. <br />When it is time to install the poles (structures), they are generally moved from the staging areas and <br />delivered to the staked location. The poles are typically placed within the right-of-way until the pole <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 29 <br />