Laserfiche WebLink
Figure 8 <br />Typical Dimensions and Right -of -Way Requirements for <br />Single Circuit 115 kV Braced Post Structure <br />0 <br />C] <br />E2 <br />LTypical Easement 37'-6" From Center J <br />When the transmission line is placed cross-country across private land, an easement for the entire <br />right-of-way (up to 75 feet wide) will be acquired from the affected landowner(s). Xcel Energy plans <br />to locate the poles as close to property division lines as reasonably possible. Figures 6-8 show the <br />right-of-way requirements for the proposed structure. <br />Xcel Energy will work within existing right-of-way for the Project whenever reasonably possible. <br />The eastern portion of the Proposed Route is located within the existing Xcel Energy Orono <br />Substation site, and no transmission corridor or easements are required for this part of the Project. <br />The transmission easement for existing Line 0831 and Structures 076 and 078 will be used as much <br />as possible for that portion of the Project where realignment of existing single circuit 115 kV <br />transmission line is being considered. In locations where existing easements are insufficient for this <br />Project, new or modified easements will be obtained, if required. <br />Approximately 866 feet of the Proposed Route will not require new right-of-way as it is proposed to <br />be constructed on Company owned property. <br />Approximately 1,795 feet of new right-of-way will need to be acquired from the HFA for the <br />Proposed Route on HFA land along the south side of the BNSF railroad and U.S. Highway 12. This <br />portion of the Proposed Route is anticipated to be located on HFA land approximately five feet <br />south of the BNSF railroad right-of-way. Approximately 475 feet of new right-of-way will also need <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 26 <br />