My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3 Alternative Routes Considered and Rejected <br />In consultation with surrounding landowners, the City and applicable regulatory agencies, Xcel <br />Energy identified and analyzed four Alternative Routes for the Project, which are identified as <br />"Alternative Route 1", "Alternative Route 2", "Alternative Route 3" and "Alternative Route 4" <br />(collectively, "Alternative Routes") in Appendix G, Figure G-1, and are further described in <br />Appendix G. Table G.1 in Appendix G provides a detailed description of the Alternative Routes, <br />including road and waterbody crossings. <br />In evaluating the Alternative Routes, Xcel Energy focused predominantly on the location of existing <br />transportation corridors, alignment of the existing distribution and transmission lines and land use <br />because they best satisfy the routing criteria. The Alternative Routes follow existing rights-of-way <br />and property lines to the extent feasible. <br />In performing the Alternative Routes analysis, Xcel Energy considered social, environmental, and <br />engineering -related factors, such as location of existing transportation and utility corridors, land use, <br />site conditions, proximity to residential or commercial structures, environmental impacts, effects on <br />trees, proximity to areas of archaeological or historical significance, proximity to wetlands or PWI <br />watercourses, and several engineering design -related factors. Based on this analysis, Xcel Energy <br />concluded that the Alternative Routes were not preferable to the Proposed Route for the reasons <br />summarized below and further described in Appendix G. <br />4.3.1 Alternative Route 1 <br />Alternative Route 1 and the Proposed Route share the same route for the first 1,701 feet of the <br />Proposed Route. At this point Alternative Route 1 deviates from the Proposed Route on a more <br />westerly course for approximately 550 feet to existing Structure 077 of Line 0831. <br />Alternative Route 1 is not preferable to the Proposed Route because it will not fulfill one main <br />objective of the Project, that being to minimize impacts to residences. As discussed in Section 4.2.2, <br />Xcel Energy is working with the two landowners whose properties are currently crossed by existing <br />Line 0831 to remove the Line 0831 from the properties and move the line north of their respective <br />property lines onto adjacent HFA property. Alternative Route 1 also requires the clearing of some <br />mature trees through the middle of one of the residential lots for right-of-way purposes. <br />4.3.2 Alternative Route 2 <br />Alternative Route 2 utilizes the portion of the Proposed Route (866 feet) prior to the Proposed <br />Route turning westerly at the BNSF railroad right-of-way. At this point Alternative Route 2 <br />continues north an approximate 326 feet and crosses the BNSF railroad, a Metropolitan Council <br />sewer line, U.S. Highway 12 and an existing Xcel Energy distribution line. Upon exiting U.S. <br />Highway 12 right-of-way, Alternative Route 2 enters the Three Rivers Park District's Baker Park <br />Reserve. From here Alternative Route 2 continues westerly approximately 974 feet across Baker <br />Park Reserve property connecting to existing Xcel Energy 115 kV transmission Line 0831 (see <br />Figure 3). The existing tower (Structure 076) located at this connection point lies within 30 feet of <br />a paved bike path within Baker Park Reserve. <br />Alternative Route 2 was rejected due to the number of transportation crossings (e.g. the BNSF <br />railroad, U.S. Highway 12), the location of an existing Metropolitan Council sewer line located <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.