My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
office of <br />{` <br />en4 <br />secure r <br />September 7, 2010 <br />Joe Sedarski <br />Xcel Energy <br />414 Nicollet Mall <br />Minneapolis, MN 55401 <br />Melanie Curtis <br />City of Orono <br />PO Box 66 <br />Crystal Bay, MN 55323 <br />95 76 Place East, 5u1re Silo, St. Paul, MN 551a1-2199 <br />=W651.296,4026 tt}: 651.2%.2560 Fax. 6}1.297.7691 <br />www .i umtlu:rCe, sW V.u1 n. us <br />Re: Local Review of Orono Substation Expansion and 115 kV Transmission Line <br />Commission Docket Number: E002/LR-10-957 <br />Dear Mr. Sedarski and Ms. Curtis, <br />Greetings. This letter confirms that the Minnesota Public Utilities Commission (Commission) <br />has received notification that Xcel Energy intends to seek local review to expand the existing <br />Orono substation and to connect this substation to the electrical transmission grid via a new 115 <br />kilovolt (kV) transmission line. The expanded substation and new transmission line would be <br />within the City of Orono in Hennepin County, Minn. <br />Under the Power Plant Siting Act, a permit from the Commission is required for transmission <br />line projects over 100 kV (Minn. Stat. § 216E). However, local review and permitting is <br />possible for eligible projects (Minn. Stat. § 216E.05). For such projects, a utility may apply to a <br />local unit of government instead of the Commission for a permit to build the project. This letter <br />confirms that Xcel Energy's proposed project is eligible for local review. <br />Xcel Energy has indicated that the City of Orono is the local unit of government with jurisdiction <br />to permit the project. A conditional use permit application was submitted to the City of Orono <br />on August 20, 2010. A local unit of government may relinquish its permitting jurisdiction by <br />requesting that the Commission assume jurisdiction within 60 days of the filing of an application <br />with the local unit of government (Minn. Rules 7850.5300, Subp. 4). <br />An environmental review process, including the development of an environmental assessment <br />(EA), must be conducted by the local unit of government with jurisdiction over the project <br />(Minn. Rules 7850.5300). This letter acknowledges that the City of Orono is the responsible <br />governmental unit for the proposed project and associated environmental review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.