My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XcelEnergy <br />RE1PONSIRLE U NATRRE" <br />January 10, 2011 <br />Melanie Curtis <br />Planning and Zoning Coordinator <br />City of Orono <br />PO Box 66 <br />Crystal Bay, MN 55323 <br />414 Nicoilet Mall <br />Minneapolis, Minnesota 55401-1993 <br />Re: Notice of Proposed Transmission Line and Substation Expansion Project <br />Orono Substation Expansion Project <br />Xcel Energy, Inc./Northern States Power Company <br />PUC Docket No. E002/TL- <br />Dear Ms. Curtis: <br />Northern States Power Company, a Minnesota corporation (Xcel Energy) proposes to expand and upgrade the <br />existing Orono Substation and construct new 115 kilovolt (kV) transmission lines to connect the planned <br />substation to existing Xcel Energy 115kV transmission Line 0831 located at 3960 Sixth Avenue North, City of <br />Orono (City), Hennepin County, Minnesota (see Figure 1). <br />The expansion and upgrade will include a complete rebuild of the existing Orono Substation, an increase in <br />operating voltage from 69kV to 115kV, and a new double circuit 115kV transmission line to connect the <br />substation to existing transmission line (Project). The Project is needed to increase the operating voltage from <br />69kV to 115kV which will improve local and system reliability, reduce the risk of overloads, and allow for <br />additional load growth in the future. <br />The purpose of this letter is to provide you notice of Xcel Energy's plan to obtain a Route Permit from the <br />Minnesota Public Utilities Commission (MPUC) for the proposed Project and request comments for the Project. <br />This notice is also required under Minn. Stat. § 216E.03, subd. 3a and 3b to allow each local governmental unit <br />(LGU) within the proposed Project area the opportunity to meet with Xcel Energy to discuss the Project prior to <br />filing a Route Permit Application (RPA). <br />Orono Substation <br />The Orono Substation is located at 3960 Sixth Avenue North, Orono, Hennepin County, MN 55356. The Project <br />site consists of approximately 16 acres and is located in the SW '/4 of the SW '/4 of Section 29 and the NW '/4 of <br />the NW '/4 of Section 32, Township 118 North, Range 23 West. The Project area is bounded by State Highway 12 <br />(Wayzata Boulevard) and the Burlington Northern Santa Fe Railroad to the north, County Road 6 (6t" Avenue <br />North) to the south and east, with a residential property boundary to the west. The property contains an existing <br />substation in the southwest corner of the property that is surrounded by open meadow with scattered trees. The <br />remainder of the property is comprised of wetland. Adjacent land use consists of large -lot, single-family homes to <br />the west and south, wetland to the north, and a highway interchange to the east. <br />Project Description <br />The existing Orono Substation has been in service since 1990 and is situated on land owned in fee by <br />Xcel Energy. All proposed substation upgrade components will be located within existing Xcel Energy <br />property. <br />Xcel Energy also proposes to build a new double circuit 115kV transmission line to connect the Orono <br />Substation to the existing 115kV Line 0831 located approximately''/2 mile northwest of the Orono <br />Substation. The Project will require modifying Xcel Energy's existing transmission Line 0881 to make this <br />connection. The new double circuit 115kV transmission line route is proposed to run north from the <br />Orono Substation across Xcel Energy property for approximately'/4 mile and then cross an additional 1/4 <br />mile of private property as shown on the attached map (see Figure 1). Please note that Xcel Energy is <br />evaluating siting/routing information and previously obtained public comments regarding the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.