Laserfiche WebLink
Xcel Energy* 414'N Collet Mall <br /> Minneapolis, Minnesota 65401-1993 <br /> SESPONSIfltE 1Y•N'.A?U7^E*' <br /> January 10, 2011 <br /> Melanie Curtis <br /> Planning and Zoning Coordinator <br /> City of Orono <br /> PO Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: Notice of Proposed Transmission Line and Substation Expansion Project <br /> Orono Substation Expansion Project <br /> Xcel Energy, Inc./Northern States Power Company <br /> PUC Docket No. E002/TL- <br /> Dear Ms. Curtis: <br /> Northern States Power Company, a Minnesota corporation (Xcel Energy) proposes to expand and upgrade the <br /> existing Orono Substation and construct new 115 kilovolt (kV)transmission lines to connect the planned <br /> substation to existing Xcel Energy 115kV transmission Line 0831 located at 3960 Sixth Avenue North, City of <br /> Orono (City), Hennepin County, Minnesota (see Figure 1). <br /> The expansion and upgrade will include a complete rebuild of the existing Orono Substation, an increase in <br /> operating voltage from 69kV to 115kV, and a new double circuit 115kV transmission line to connect the <br /> substation to existing transmission line (Project). The Project is needed to increase the operating voltage from <br /> 69kV to 115kV which will improve local and system reliability, reduce the risk of overloads, and allow for <br /> additional load growth in the future. <br /> The purpose of this letter is to provide you notice of Xcel Energy's plan to obtain a Route Permit from the <br /> Minnesota Public Utilities Commission (MPUC) for the proposed Project and request comments for the Project. <br /> This notice is also required under Minn. Stat. §216E.03, subd. 3a and 3b to allow each local governmental unit <br /> (LGU)within the proposed Project area the opportunity to meet with Xcel Energy to discuss the Project prior to <br /> filing a Route Permit Application (RPA). <br /> Orono Substation <br /> The Orono Substation is located at 3960 Sixth Avenue North, Orono, Hennepin County, MN 55356. The Project <br /> site consists of approximately 16 acres and is located in the SW %of the SW%of Section 29 and the NW %of <br /> the NW%of Section 32, Township 118 North, Range 23 West. The Project area is bounded by State Highway 12 <br /> (Wayzata Boulevard) and the Burlington Northern Santa Fe Railroad to the north, County Road 6 (6th Avenue <br /> North)to the south and east, with a residential property boundary to the west.The property contains an existing <br /> substation in the southwest corner of the property that is surrounded by open meadow with scattered trees. The <br /> remainder of the property is comprised of wetland. Adjacent land use consists of large-lot, single-family homes to <br /> the west and south, wetland to the north, and a highway interchange to the east. <br /> Project Description <br /> The existing Orono Substation has been in service since 1990 and is situated on land owned in fee by <br /> Xcel Energy. All proposed substation upgrade components will be located within existing Xcel Energy <br /> property. <br /> Xcel Energy also proposes to build a new double circuit 115kV transmission line to connect the Orono <br /> Substation to the existing 115kV Line 0831 located approximately 1/2 mile northwest of the Orono <br /> Substation. The Project will require modifying Xcel Energy's existing transmission Line 0881 to make this <br /> connection. The new double circuit 115kV transmission line route is proposed to run north from the <br /> Orono Substation across Xcel Energy property for approximately 1/4 mile and then cross an additional % <br /> mile of private property as shown on the attached map (see Figure 1). Please note that Xcel Energy is <br /> evaluating siting/routing information and previously obtained public comments regarding the Project. <br />