My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Notice of Xcel Energy Filing Permit Appl
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Notice of Xcel Energy Filing Permit Appl
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/27/2021 10:44:02 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Metropolitan Council <br /> October 26,2010 <br /> Xcel Energy <br /> ATT'N:Joe Se erSki, Senior."Permitting Analyst <br /> 11 41141calletMall—MP8 <br /> Minneapolis,MN 55401;: <br /> RE: Request for~Coininents on Proposed Orono Substation Expansion and New 115kV Transmission <br /> Line Project Environmental Assessment Scoping Comments <br /> City of Orono.Zoning Application-410-3486 <br /> PUC Docket No.E0021LR-10-957 <br /> Council Review File No.20780-1 <br /> Dear Mr.Sedarski: <br /> The Metropolitan Council(Council)received)(cel Energ tequest for comments an the scopeof the <br /> Environmental Assessment(EA)that wine prepared for ttiti'oposed Orono substation expansion and <br /> new 115kV transmission line project <br /> The Orono substation is located,at'960 Sixth Avenue North itt`Oranrt Ones`ota. The proposed project <br /> would completely-rebuild the eciSCing substation to increase its!operafitg t+oltage from 69kV to::115kV, <br /> construct a new 0.5.mile 115kV transmission line to connect the substation to existing 115kV Line 0831, <br /> and remove an unspecified length of existing GRE Litt ,BD-69kV. The following comments are offered <br /> that will need to'be dressed,in the EA document. <br /> The proposed substation expansion project is located near Baker Park Reserve,owned and operated by <br /> Three Rivers Park District,and part of the metropolitan area's regional parks system, The potential <br /> visual and noise impacts to the park reserve should be evaluated,in the BA.and the,proposed <br /> disconnection and removal of power line GRE Line BD-69kV-through$aker.Rari tkkeserve should be <br /> coordinated with Three Rivers Park District, <br /> The proposed new transmission line will cross Council forcemain Interceptor 8352 south of Highway <br /> 12 and east of Hunt Farm Road. This 12-inch diameter Ductile Iron Pipe interceptor was built in 2008 <br /> at a depth of approximately 12 feetTo assess the potential impacts to the interceptor pipe in this <br /> location,preliminary plans should be sent to Scott Dentz,Metropolitan Council Environmental <br /> Services Interceptor Engineering Manager(651-602-4503)for review and comment,prior to initiating <br /> the project. <br /> Please contact Jim Larsen PE, Senior Planner,with any questions at 651-.602-1159. <br /> Sincerely, <br /> Phyllis Hanson,Manager <br /> Local Planning Assistance <br /> cc: Robert McFarlin,District 3 Council Member <br /> Susan Hoyt,Planning Sector Representative <br /> Judy Sventek,Water Resources Assessment <br /> Cheryl Olsen,Reviews Coordinator <br /> wj w.metrocounc[I,txr <br /> 300 Hobert Street North • St. Paul. ti1N 55101-1805 • (651)602-1000 • N'ax(6511 602-1550 • `IT?(651)201-0904 <br /> An',qua Oppbrifant!!stt '. <br />
The URL can be used to link to this page
Your browser does not support the video tag.