Laserfiche WebLink
0ti�rieso% Minnesota Department of Transportation <br /> j .MetropoIitan <br /> 'District <br /> ,„ _ Waters Edge <br /> �opr i, 1500 West'County Road B-2: <br /> a <br /> Roseville,MN-5113 3174 <br /> October 14,2010 <br /> Xcel Energy <br /> ATTN: Joe Sedarski,Senior Permitting Analyst <br /> 414 Nicollet'11 ail—MPS <br /> Minneapolis,MN 55401 <br /> SUBJECT: Orono g'n'bstation Expansion and 1151cV Transmissi9114.0e4410 036, <br /> SW Quadrant of US 12 and 6th Ave.N. M <br /> Orono,Hennepin Ave <br /> Contrc, $t{ot n, Zia" <br /> De ;Mr,Sedarslci. <br /> Thaq you for t portunity to comment on the Orono Substation txpafitsitin a'nd••1151N <br /> tatlimissioxi1. to Project. Mn/DOT has reviewed the infor tion and has the following <br /> dominents: <br /> The proposed location of the new transmission line will be an improvement over the extstif, . <br /> 6910/ GRIT Line BD,which will be disconnected, since it•Wllbbe located farther from themewUS <br /> 12/County Road 6 iritercb nge. Mn/DOT does not have.anriecincerns with the scope of the.EA. <br /> If the new transmissiot tttt�ongMn/DOT right ' londgti t `witbe <br /> V <br /> q wtbtn or affectingMn/DOT X: tares aJiermit.Permit <br /> required. use ar +'' <br /> forms are availalile.T•om Nt1iDO`lu:s utility website at www d * p usftecsuphrtility.Please <br /> include one 11 x 11 plan set and ie full size plan set with ea , iertittapplication. Please direct <br /> any questions regadan,peinit requirementWOIck CraigDOT'sMetroPermits'Section,at <br /> (651)'234-7911. <br /> We look forward to reviewing the'EftVironrnentAl Assessment when it becomes available. If you <br /> have any questions concerning this.rWew pleasefeel free to contact me at(651)234-7794. <br /> Sineerely <br /> Tod;Sherman <br /> Planning Supervisor <br /> Copy: Bob Byers/Hennepin County Planning <br /> Melanie Curtis/City of Orono <br /> An equal opportunity employer <br />