Laserfiche WebLink
t <br /> • remove three existing transmission structures (Structures 076, 077, and 078) and <br /> associated 1,030 feet of single circuit 115 kV transmission Line 0831 and installing two <br /> new structures and approximately 1,095 feet of single circuit 115 kV transmission line to <br /> re-route the existing line off of residential property and onto adjacent Huntington Farm <br /> Association ("HFA")1 property adjacent to the BNSF railroad; <br /> • disconnect the existing Line 0831 at transmission Structure 077, install a new double <br /> circuit corner structure, and connect the new double circuit 115 kV transmission line <br /> from the new Orono Substation to Line 0831; <br /> • installing fiber optic ground wire with the new 115 kV transmission line and the replaced <br /> segment of Line 0831; <br /> • except for existing switchgear (which will be reused in the new substation), remove the <br /> existing Orono Substation and construct the replacement Orono Substation as a 115- <br /> 13.8 kV transmission substation to accommodate the new 115 kV line termination <br /> and/or ring bus by, installing a 28 MVA, 118-14.3 kV transformer, adding transfer trip <br /> and pilot relaying, installing fiber optic lines for relaying and transfer trip, installing <br /> breakers, reconfiguring line protection, replacing shield wire with fiber optic shield wire, <br /> and related modifications;and <br /> • revise as needed line designations, terminals, breakers, relays, and line protection as a <br /> result of the above changes in connecting the new Orono Substation to 115 kV <br /> transmission Line 0831. <br /> While not part of the requested Route Permit for this Project, the following work will also be <br /> completed: <br /> • disconnect approximately 385 feet of existing Great River Energy (GRE) 69 kV <br /> transmission line (BD) from the existing Orono Substation and re-route approximately <br /> 420 feet of this line around the proposed new Orono Substation and associated new 115 <br /> kV transmission line facilities (the re-routed GRE 69 kV transmission line would not be <br /> connected to the new Orono Substation). <br /> The existing Orono Substation has been in service since 1990 and is situated on land owned in fee <br /> by Xcel Energy. All proposed substation upgrade components will be located within existing Xcel <br /> Energy property. <br /> Xcel Energy also proposes to build a new double circuit 115 kV transmission line to connect the <br /> Orono Substation to the existing 115 kV Line 0831 located approximately 1/a mile northwest of the <br /> Orono Substation. The proposed transmission structures are single-pole, galvanized steel or <br /> weathering-steel type structures. The height of the new single circuit poles will range from 70 to 90 <br /> feet while the double circuit poles will range from 75 to 115 feet, with the spans between poles <br /> ranging from 300 to 500 feet. <br /> 1 HFA is an association of landowners which are a part of the Huntington Farm residential development that is located <br /> west of the existing Orono Substation site. HFA owns undeveloped parcels surrounding the residential parcels that <br /> are part of HFA. <br /> 2 <br />