Laserfiche WebLink
16 <br /> 1 MR . JEFF GUTZMANN : Oh , excuse me . The <br /> 2 structure here is the tallest structure because we <br /> 3 have to cross a railroad and a road and maintain <br /> 4 clearance . This structure here will be 100 feet , <br /> 5 proposed . The adjacent structure to the east is <br /> 6 90 feet . The next structure at this corner where it <br /> 7 turns , 90 feet , and we currently have 80 feet for <br /> 8 the remaining structures . <br /> 9 MR . DAVE WILSON : That ' s the exposed <br /> 10 height . <br /> 11 MR . JEFF GUTZMANN : Exposed height <br /> 12 aboveground . The structure here where the line <br /> 13 turns , this is a single-circuit coming in at this <br /> 14 point and this is a single-circuit as it heads to <br /> 15 the northeast . This is a double-circuit portion to <br /> 16 this intersection point . So this line basically <br /> 17 just needs to take a turn . We ' re proposing a <br /> 18 structure similar to the one shown second from the <br /> 19 left in the back . That ' s basically just to capture <br /> 20 the wires and turn . <br /> 21 We ' re also changing wire configurations , <br /> 22 and that is a change from - - the wires are in a <br /> 23 horizontal configuration . They ' re going to roll to <br /> 24 a vertical configuration here on that structure <br /> 25 there . And they ' ll maintain a vertical <br />