My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Replacement
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/23/2021 3:38:36 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIIIL <br /> I <br /> I <br /> I of developable land in this area as it is sited within existing Xcel Energy property, adjacent to <br /> existing highway and railroad rights-of-way,and within undeveloped HFA land. <br /> I The closest commercial business is a gas station located in the City of Maple Plain approximately 0.75 <br /> miles northwest from the proposed Project. This structure is located on the northeast corner of the <br /> intersection of U.S. Highway 12 and County Road 19. See Appendix B-3. <br /> IThe closest rural residence to the proposed new transmission line and substation replacement is <br /> located approximately 220 feet south and across 6th Avenue North from the proposed Orono <br /> I Substation replacement area. The closest farmstead residence is located approximately 0.5 miles <br /> directly south of the beginning of the proposed line at a residence on Orchard Park Road which is <br /> approximately 600 feet north of Watertown Rd. See Appendix B-2. <br /> I The numbers of occupied structures located within various distances from the Project are shown in <br /> Table 8 below. <br /> I Table 8 <br /> Distance to Occupied Structures <br /> I Number of Farmsteads, Number of Farmsteads, Number of Farmsteads, <br /> Residences or Residences or Residences or <br /> Commercial Operations Commercial Operations Commercial Operations <br /> within 0-50'of Proposed within 51-100'of within 101-200'of <br /> I Segment Site/Line Proposed Line Proposed Line <br /> Proposed Substation 0 0 0 <br /> Re.lacement <br /> I Pro.osed Route 0 0 0 <br /> Alternative Route 1 0 0 1 <br /> Alternative Route 2 0 0 0 <br /> Alternative Route 3 0 0 1 <br /> I <br /> Alternative Route 4 0 0 0 <br /> IMitigative Measures <br /> Land uses near the Project are not expected to change as a result of the construction and operation <br /> of the proposed transmission line and substation. Permanent impacts will be limited to the area <br /> Iwhere structures (e.g. poles) are placed and to the construction areas as described in Section 5.1.1 <br /> For the Proposed Route, the structures and overhead transmission lines will be placed within the <br /> I existing Xcel Energy property and within primarily undeveloped areas on HFA land along existing <br /> transportation corridors. Impacts to surrounding land uses will be minimized by following within or <br /> adjacent to existing roadways, railroad and utility rights-of-way as much as possible. <br /> I6.2.3 Displacement <br /> I NESC and Xcel Energy standards require certain clearances between substation and transmission <br /> line facilities and buildings for safe operation of the facilities. There is sufficient land at the existing <br /> 16 acre Orono Substation site to maintain substation clearances for the proposed expanded Orono <br /> Substation and associated new transmission line. Off of the Orono Substation site, Xcel Energy <br /> Iacquires appropriate right-of-way for transmission lines that is sufficient to maintain these <br /> I Orono Project June 7, 2011 <br /> MPUC Docket No. E002/TL-11-223 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.