Laserfiche WebLink
I <br /> I <br /> Table of Contents <br /> Page <br /> I <br /> 1.0 EXECUTIVE SUMMARY 1 <br /> 1.1 Proposal Summary 1 <br /> 1.2 Completeness Checklist 3 <br /> I <br /> 2.0 INTRODUCTION 6 <br /> 2.1 Statement of Ownership 6 <br /> I <br /> 2.2 Requested Action 6 <br /> 2.3 Permittee 6 I 2.4 Certificate of Need 8 <br /> 2.5 Route Permit,Alternative Permitting Process 8 I 2.6 Notice to Commission 8 <br /> 3.0 PROJECT INFORMATION 9 <br /> 3.1 Project Location 9 <br /> I <br /> 3.2 Project Proposal 9 <br /> 3.3 Need for Project 10 <br /> I <br /> 3.4 Project Schedule 10 <br /> 3.5 Project Cost 11 I 4.0 FACILITY DESCRIPTION AND ROUTE SELECTION RATIONALE 12 <br /> 4.1 Transmission Line Description 12 <br /> 4.2 Route Width and Alignment Selection Process 14 <br /> I <br /> 4.2.1 Route Width 14 <br /> 4.2.2 Route Selection Process 14 <br /> I <br /> 4.3 Alternative Routes Considered and Rejected 16 <br /> 4.3.1 Alternative Route 1 16 <br /> 4.3.2 Alternative Route 2 16 <br /> I <br /> 4.3.3 Alternative Route 3 17 <br /> 4.3.4 Alternative Route 4 17 <br /> I <br /> 4.4 Associated Facilities and Substation Modifications 18 <br /> 4.4.1 Orono Substation (Replacement) 18 <br /> 4.4.2 Transmission Structures 076,077 and 078 (Existing) 19 I 4.5 Design Options to Accommodate Future Transmission Lines 20 <br /> 5.0 ENGINEERING DESIGN, CONSTRUCTION AND RIGHT-OF-WAY <br /> ACQUISITION 21 <br /> I <br /> 5.1 Structures, Right-of-Way, Construction and Maintenance 21 <br /> 5.1.1 Transmission Structures 21 <br /> I <br /> i <br />