My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Replacement
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/23/2021 3:38:36 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Iisbased on information known as of the date of this filingand upon planning <br /> Project schedule s p p g <br /> assumptions that balance the timing of implementation with the availability of crews and materials <br /> I and with other practical considerations. This schedule may be subject to revision as further <br /> information is developed. <br /> I3.5 Project Cost <br /> Xcel Energy estimates that the Proposed new transmission line and new Orono Substation will cost <br /> I approximately $5.3 million, depending upon the selected route, and broken down as follows in <br /> Table 3. <br /> I <br /> Table 3 <br /> Estimated Project Cost <br /> I Project Item <br /> Cost <br /> New 115 kV Transmission Line Facilities along Proposed $1.2 million <br /> Route <br /> IOrono Substation Removal and Replacement $4.1 million <br /> Total Project Cost $5.3 million <br /> IXcel Energy will construct, operate and maintain the new Orono Substation and transmission lines <br /> proposed in this Project. <br /> I Operating and maintenance costs for the transmission line will be nominal for several years, since <br /> the line will be new and minimal vegetation maintenance will be required. Typical annual operating <br /> and maintenance costs for 115 kV transmission voltages across Xcel Energy's Upper Midwest <br /> I <br /> system area are on the order of$300 to $500 per mile of transmission right-of-way. The principal <br /> operating and maintenance cost include inspections, which are usually done by fixed-wing aircraft <br /> and by helicopter on a regular basis. <br /> IThe Company performs periodic inspections of substations and equipment. The type and frequency <br /> of inspection varies depending on the type of equipment. Typical inspection intervals are semi- <br /> I annual or annual. Maintenance and repairs are performed on an as-needed basis, and therefore the <br /> cost varies from substation to substation. <br /> I <br /> I <br /> I <br /> I <br /> I• Orono Project June 7,2011 <br /> MPUC Docket No. E002/TL-11-223 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.