Laserfiche WebLink
I <br /> I <br /> Iisbased on information known as of the date of this filingand upon planning <br /> Project schedule s p p g <br /> assumptions that balance the timing of implementation with the availability of crews and materials <br /> I and with other practical considerations. This schedule may be subject to revision as further <br /> information is developed. <br /> I3.5 Project Cost <br /> Xcel Energy estimates that the Proposed new transmission line and new Orono Substation will cost <br /> I approximately $5.3 million, depending upon the selected route, and broken down as follows in <br /> Table 3. <br /> I <br /> Table 3 <br /> Estimated Project Cost <br /> I Project Item <br /> Cost <br /> New 115 kV Transmission Line Facilities along Proposed $1.2 million <br /> Route <br /> IOrono Substation Removal and Replacement $4.1 million <br /> Total Project Cost $5.3 million <br /> IXcel Energy will construct, operate and maintain the new Orono Substation and transmission lines <br /> proposed in this Project. <br /> I Operating and maintenance costs for the transmission line will be nominal for several years, since <br /> the line will be new and minimal vegetation maintenance will be required. Typical annual operating <br /> and maintenance costs for 115 kV transmission voltages across Xcel Energy's Upper Midwest <br /> I <br /> system area are on the order of$300 to $500 per mile of transmission right-of-way. The principal <br /> operating and maintenance cost include inspections, which are usually done by fixed-wing aircraft <br /> and by helicopter on a regular basis. <br /> IThe Company performs periodic inspections of substations and equipment. The type and frequency <br /> of inspection varies depending on the type of equipment. Typical inspection intervals are semi- <br /> I annual or annual. Maintenance and repairs are performed on an as-needed basis, and therefore the <br /> cost varies from substation to substation. <br /> I <br /> I <br /> I <br /> I <br /> I• Orono Project June 7,2011 <br /> MPUC Docket No. E002/TL-11-223 11 <br />