Laserfiche WebLink
1.2 Jurisdiction <br /> At this time, there are no federal regulatory triggers that require compliance with federal historic <br /> preservation laws, specifically Section 106 of the National Historic Preservation Act of 1966 <br /> ("NHPA"), as amended. Environmental review of the Project falls under the jurisdiction of the <br /> MPUC. Xcel Energy will provide in the Application to the MPUC a description of the effects of the <br /> Proposed Route and Orono Substation expansion on archaeological and historic resources to assist ' <br /> in the preparation of an environmental impact statement under Minnesota Rules Chapter 7850.1900, <br /> Subp. 3(D). Also, Minnesota state historic preservation laws protect human burials of all types (see <br /> Minnesota Private Cemeteries Act [Minn. Stat. § 307]), and archaeological sites and historic <br /> properties that are listed on the National Register of Historic Places ("NRHP") or the Minnesota <br /> Register of Historic Sites (see Minnesota Historic Sites Act [Minn. Stat. § 138.661-138.6691]). <br /> 1.3 Project Location <br /> The proposed Project is located within Hennepin County, Minnesota. Figure 1 shows an overview ' <br /> of the general vicinity of the Project and the Proposed Route is shown in Figure 2. Figure 3 shows <br /> the planned expansion of the existin Orono Substation facili . The Project is wholl located <br /> within the municipal boundaries of <br /> in Hennepin County,Minnesota. <br /> The Project consists of a new linear transmission line that generally will run north and west for an <br /> approximate 3,136 feet and the expansion of the existing substation site. The fenced area of the <br /> existing Orono Substation is approximately 0.1 acres. The proposed 115 kV Orono Substation <br /> encompasses an area of approximately 1.2 acres within the existing Xcel Energy 16-acre site, and <br /> includes the existing 0.1 acre site. <br /> The proposed transmission line will originate at the proposed expanded Orono Substation, and <br /> initially remain on Xcel Energy property. At the point the Proposed Route exits the proposed <br /> substation expansion area,it extends approximately 866 feet northwesterly and north within the 16- <br /> acre substation site and along Xcel Energy's western property line to the Burlington Northern Santa <br /> Fe ("BNSF") railroad right-of-way. At this point the Proposed Route extends westerly across <br /> adjacent Huntington Farm Association ("HFA") property paralleling the BNSF railroad right-of-way <br /> approximately 1,795 feet before turning southwest for an additional 475 feet where it will connect to <br /> existing transmission Structure 078 that supports Xcel Energy transmission Line 0831. <br /> Xcel Energy is currently in the process of evaluating siting/routing information and collecting <br /> comments and input from the Local Government Unit("LGU"), regulatory officials, the public, and <br /> other interested parties. The Proposed Route location shown in Figure 2 is preliminary and subject <br /> to change through this process. <br /> In order to study the cultural background of the Project location and better understand the potential <br /> for impacts to cultural resources, a 1-mile buffer around the Project location was used to gather <br /> information. The Project area plus the 1-mile buffer is called the Cultural Resources Study Area (or <br /> "Study Area"). <br /> Orono Project Phase Ia Literature Review April,2011 <br /> MPUC Docket No.E002/TL-11-223 4 <br />