My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Replacement
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/23/2021 3:38:36 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Item#12-CC Agenda-12/13/2010 <br /> File#10-3486[Total Pages 8 OUnCII <br /> IXcelEnergyM Exhibit A <br /> I <br /> PROPOSED ORONO SUBSTATION EXPANSION AND NEW 115KV TRANSMISSION LINE <br /> I FACT SHEET <br /> PROJECT NEED: Northern States Power Company, doing business as Xcel Energy, plans to <br /> I expand and upgrade its Orono Substation and build a new 115 kilovolt ("kV") overhead <br /> transmission line connecting the planned substation to an existing 115kV transmission line. The <br /> substation upgrade to 115kV and new transmission line will increase electric system reliability, <br /> I <br /> reduce the risk of overloads, and will allow for additional load growth in the future. <br /> PROJECT DESCRIPTION:I <br /> T 1 <br /> • The existing Orono Substation operates at 69kV and will be `` at ., <br /> removed and replaced by a 115kV <br /> located <br /> 4 ,� <br /> , <br /> ' ` T ' -A <br /> adjacent to thecurenlocationall within propertyowned I by Xcel Energy. ' .' <br /> • Once the new 115kV substation and associated <br /> I transmission line work is completed, the 69kV substation t <br /> components will be removed. <br /> • Approximately 1/4 mile of new double circuit 115kV <br /> I transmission line will be routed out of the new substation •,:,.:.,;_,,IL ,?t lt' <br /> north over Xcel Energy property, and then approximately '/ <br /> mile northwesterly over privately owned land to connect tor.':;:-,.-4:-:" , ��'Cp . <br /> Ian existing 115kV transmission line. <br /> y <br /> • Proposed structures for the new transmission line will be I <br /> 80-100 feet tall single steel poles with davit arms placed on <br /> Iconcrete foundations. <br /> • New easements will need to be obtained for the Typical Double Circuit <br /> transmission line portion crossing over private property. Steel Single Pole <br /> • Xcel Energy is seeking local review and approval of the project from the Minnesota Public <br /> Utilities Commission, and the City of Orono has agreed to take local jurisdiction for permitting <br /> I the project. <br /> • Xcel Energy has applied for a Conditional Use Permit ("CUP") with the City of Orono as <br /> required for the project. <br /> I • Once the CUP is approved by the City and State permitting requirements are met, <br /> construction is expected to begin in the fall of 2011 with completion of the new substation <br /> Iand transmission line by late 2012. <br /> CONTACTS: <br /> IJoe Sedarski, Sr. Permitting Analyst, Xcel Energy <br /> Tel: (612) 330-6435 e-mail: joseph.g.sedarski(c�xcelenergy.com <br /> Chris Rogers, Sr. Land Rights Agent, Xcel Energy <br /> 1 Tel: (612) 330-6078 e-mail: christopher.c.rogers(xcelenergy.com <br /> September 1, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.