Laserfiche WebLink
I <br /> I <br /> Authority Required Information \\here <br /> I <br /> C. at least two proposed routes for the proposed high voltage Not Applicable <br /> transmission line and identification of the applicant's preferred per Minn. R. <br /> route and the reasons for the preference 7850.3100. <br /> I <br /> However see <br /> 4.3 <br /> D. a description of the proposed high voltage transmission line and 3.2,4.1,4.4, I all associated facilities including the size and type of the high 5.1.1 <br /> voltage transmission line <br /> E. the environmental information required under 7850.1900,Subp. 3 Chapter 6 <br /> I <br /> F. identification of land uses and environmental conditions along the Chapter 6 <br /> proposed routes <br /> G. the names of each owner whose property is within any of the 8.2 and <br /> I <br /> proposed routes for the high voltage transmission line Appendix D.1 <br /> I I. United States Geological Survey topographical maps or other Appendix B <br /> maps acceptable to the chair showing the entire length of the high <br /> I <br /> voltage transmission line on all proposed routes <br /> I. identification of existing utility and public rights-of-way along or 4.1,4.2,4.3, <br /> parallel to the proposed routes that have the potential to share 5.1.2 <br /> I <br /> right-of-way, the land used by a public utility(as for a transmission <br /> line),with the proposed line <br /> J. the engineering and operational design concepts for the proposed 5.0, 5.2 <br /> high voltage transmission line, including information on the <br /> electric and magnetic fields of the transmission line <br /> K. cost analysis of each route, including the costs of constructing, 3.5 <br /> I <br /> operating, and maintaining the high voltage transmission line that <br /> are dependent on design and route <br /> L. a description of possible design options to accommodate 4.5 <br /> I <br /> expansion of the high voltage transmission line in the future <br /> M. the procedures and practices proposed for the acquisition and 5.1.3 — 5.1.6 <br /> restoration of the right-of-way, construction, and maintenance of <br /> I <br /> the high voltage transmission line <br /> N. a listing and brief description of federal, state, and local permits 8.4 <br /> that may be required for the proposed high voltage transmission <br /> line <br /> I <br /> 0. a copy of the Certificate of Need or the certified HVTL list 2.4 <br /> containing the proposed high voltage transmission line or <br /> documentation that an application for a Certificate of Need has <br /> I <br /> been submitted or is not required <br /> Minn. R. Enonnmental Information <br /> 7850.1900, Subp. <br /> I <br /> 3 <br /> A. a description of the environmental setting for each site or route 6.1 1 <br /> B. a description of the effects of construction and operation of the 6.2 <br /> I <br /> facility on human settlement, including, but not limited to, public <br /> health and safety, displacement, noise, aesthetics, socioeconomic <br /> impacts, cultural values,recreation, and public services <br /> I <br /> Orono Project June 7,2011 <br /> I <br /> MPUC Docket No. E002/TL-11-223 4 <br />