Laserfiche WebLink
1 <br /> I <br /> STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION <br /> IROUTE PERMIT FOR CONSTRUCTION OF A HIGH-VOLTAGE TRANSMISSION <br /> LINE AND ASSOCIATED FACILITIES <br /> IIN HUBBARD COUNTY <br /> I ISSUED TO <br /> GREAT RIVER ENERGY <br /> PUC DOCKET NO. ET2/TL-10-86 <br /> IIn accordance with the requirements of Minnesota Statutes pter 216E and Minnesota Rules <br /> Chapter 7850,this route permit is hereby issued to: <br /> GREAT RIVER ENERGY <br /> I Great River Energy is authorized by this route permit t '' o eruct a new 7.25-mile 115 kilovolt <br /> (kV)transmission line between a newly pro ,sed Potato a substation to be constructed in <br /> Arago Township and a tap point on Grea River Energy's existing Mantrap Sub Tap 34.5 kV <br /> I transmission line in Lake Emma Township, Hubbard County,Ilinesota. The new 115 kV <br /> transmission facility line would ini �� bei .erated at 34.5 kV til conversion to 115 kV <br /> becomes necessary. <br /> I . <br /> The transmission line and .sso �€at ities shall built uilt within the route identified in this <br /> permit, as portrayed on th= official route maps, an. �1 c ` lianee with the conditions specified <br /> in this permit. <br /> i , <br /> 4:"N,\....,' <br /> to <br /> Approved an• ';',11,..,'ed t d of November, 2010 <br /> BY ORDER OF T & COMMISSION <br /> I <br /> IBurl W. Haar, <br /> Executive Secretary l <br /> I <br /> I <br /> I <br /> IThis document can be made available in alternative formats(i.e.,large print or audio)by calling 651.296.0406(voice). Persons <br /> with hearing or speech disabilities may call us through Minnesota Relay at 1.800.627.3529 or by dialing 711. <br /> I <br />