My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Expansion - Enviromental Assessment (1)
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Expansion - Enviromental Assessment (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/23/2021 2:52:01 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Energy Facility Permitting <br /> Scoping Decision Document <br /> PUC Docket No.E002/TL-11-223 <br /> http://energyfacilities.puc.state.mn.us/Docket.html?Id=32082 or on the eDockets website at: <br /> https://edockets.state.mn.us/EFiling/search.jsp, select"11" for Year and"223"for Number. <br /> MATTERS TO BE ADDRESSED <br /> Having reviewed the matter, consulted with EFP staff, and in accordance with Minnesota Rule <br /> 7850.3700, I hereby make the following scoping decision: <br /> The issues outlined below will be identified and described in the environmental assessment for <br /> the proposed Orono 115 kV project. The assessment will describe the project and current setting <br /> of the proposed project area. It will also provide information on the potential impacts the <br /> proposed project could have as they relate to the topics outlined in this scoping decision <br /> document, including possible mitigation for identified impacts, identification of irretrievable <br /> commitment of resources and permits from other government entities that may be required. <br /> I. GENERAL DESCRIPTION OF THE PROPOSAL <br /> A. Project Description , <br /> B. Purpose of the Transmission Line <br /> C. Project Location <br /> D. Route Description ' <br /> 1. Route Width <br /> 2. Right-of-Way <br /> E. Project Cost <br /> II. REGULATORY FRAMEWORK <br /> A. Certificate of Need <br /> B. High-Voltage Transmission Line Route Permits <br /> C. Environmental Review Process <br /> III. ENGINEERING AND OPERATION DESIGN <br /> A. Transmission Line Conductors <br /> B. Transmission Line Structures <br /> C. Substations <br /> IV. CONSTRUCTION <br /> A. Transmission Line and Structures <br /> B. Substations <br /> C. Restoration and Cleanup <br /> D. Operation and Maintenance <br /> E. Property/Right-of-Way Acquisition and Displacement <br /> 4 of 9 ' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.