My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Expansion - Enviromental Assessment (1)
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Expansion - Enviromental Assessment (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/23/2021 2:52:01 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSIBLE GOVERNMENT UNIT <br /> ' Minnesota Department of Commerce Suzanne Steinhauer <br /> Division of Energy Resources State Permit Manager <br /> 85 7th Place East,Suite 500 (651) 296-2888 <br /> St.Paul,Minnesota 55101-2198 Suzanne.steinhauer@state.mn.us <br /> ' PROJECT OWNER <br /> Xcel Energy Joseph G. Sedarski <br /> 414 Nicollet Mall,MP-8 Senior Permitting Analyst <br /> Minneapolis,Minnesota 55401 (612) 330-6435 <br /> Ii oseph.g.sedarski@xcelenergy.com <br /> ABSTRACT <br /> ' Pursuant to the provisions of Minnesota Statutes,chapter 216E,Xcel Energy(applicant) filed a <br /> high-voltage transmission line route permit application with the Minnesota Public Utilities <br /> Commission (Commission)on June 7,2011, for a proposed 115 kilovolt(kV) transmission line and <br /> ' modifications to the existing transmission lines and substations. <br /> Xcel Energy proposes to construct the Orono Substation Expansion and new 115 kV Transmission <br /> Line Project(Project). As proposed, the Project would replace the existing 69 kV Orono Substation <br /> with a new 115 kV substation at the same location,but with a larger footprint. The Project would <br /> connect the upgraded substation to the existing Xcel Energy 115 kV transmission line 0831 through <br /> ' a new double circuit 115 kV transmission lines of approximately 0.4 miles. The Project,as <br /> proposed,would also relocate approximately 0.2 miles of single circuit 115 kV transmission line. <br /> While not part of the Route Permit requested by Xcel Energy,approximately 400 feet of the existing <br /> ' Great River Energy 69 kV transmission line BD would be rerouted around the new Orono <br /> Substation. <br /> ' Minnesota Department of Commerce Energy Facilities Permitting(EFP) is tasked with conducting <br /> environmental review of the applications for transmission line route permits. The intent of this <br /> environmental assessment document and the environmental review process is to inform the public, <br /> the applicant,and decision-makers of the potential impacts from the proposed project and possible <br /> mitigations for those impacts. <br /> ' Persons interested in these matters can register their names on the project contact list at <br /> http://energyfacilities.puc.state.mn.us/Docket.html?Id=32082 or by contacting: Suzanne <br /> Steinhauer,Energy Facility Permitting,85 7th Place East, Suite 500,St. Paul,Minnesota, 55101, <br /> ' phone: (651)-296-2888,email: suzanne.steinhauer@state.mn.us. <br /> Documents related to this project can be found at the above website or also by going to: <br /> • https://www.edockets.state.mn.us/EFiling/search.jsp and entering"11" for Year and"223" for <br /> ' Number,under search criteria. <br /> 1 <br /> Environmental Assessment <br /> PUC Docket E002/TL-11-223 Page i <br />
The URL can be used to link to this page
Your browser does not support the video tag.