Construction equipment typically used on a transmission project would include tree removal <br /> equipment,mowers,cranes,backhoes,digger-derrick line trucks,track-mounted drill rigs,dump <br /> trucks, front end loaders,bucket trucks,bulldozers, flatbed tractor-trailers, flatbed trucks,pickup <br /> trucks,concrete trucks and various trailers. <br /> Transmission line structures are generally designed for installation at existing grades. However, <br /> along areas with more than 10 percent slope,working areas may have to be graded level or fill would <br /> be brought in to create working pads. If the landowner permits,Xcel Energy prefers to leave the <br /> leveled working pads in place for future maintenance activities,as necessary. If the landowner does <br /> not agree,Xcel Energy will grade the site back to its original condition and any imported fill is <br /> removed from the area. <br /> Typically existing roads or trails that run parallel or perpendicular to the proposed route are used to <br /> access the actual transmission line right-of-way. Where use of private field roads or trails is <br /> necessary,permission from the property owner would be obtained by Xcel Energy prior to access. <br /> In some cases,new access roads or temporary lay down areas may be required due to problematic <br /> structure locations,when no current access is available,or existing access is inadequate for the heavy <br /> equipment used in construction. Should these areas fall outside the right-of-way,temporary <br /> easements would be arranged with the affected landowner. These temporary easements are not <br /> typically part of the route permit issued by the Commission for high-voltage transmission lines. <br /> Staging areas are often established for a project to provide a location to deliver and store materials <br /> required for construction. Xcel Energy anticipates using the Orono Substation site or other nearby <br /> Xcel Energy substation sites as staging areas for the Project. If needed,additional temporary staging <br /> areas outside the transmission line right-of-way or at non-Xcel Energy sites will be obtained through <br /> rental agreements. <br /> Transmission line structures are typically delivered to their staked location or to a designated staging <br /> area depending on delivery and contractor availability. If the poles are delivered to a staked site,they <br /> are typically designed for the specific site location at which they are to be constructed and are placed <br /> along the right-of-way out of the clear zone of any adjacent highways or designed pathways and <br /> marked for visibility. <br /> One of the structures is considered to be a"tangent" structure,or in a straight line with both its <br /> adjacent structures. Xcel Energy anticipates that this structure would be direct embedded. Direct <br /> embedding would generally require an excavation of a three to four foot diameter hole at least 15 <br /> feet deep or greater,depending on soil conditions and other factors. The poles are typically framed <br /> with insulators and hardware on the ground and then lifted and placed in the hole via a bucket truck <br /> or a crane,depending on the weight of the structure. The poles would be backfilled with native soils <br /> or crushed rock depending on soil and design conditions. In lowland areas,a galvanized steel <br /> culvert may be also inserted for pole stability due to poor soil capacity. Any excess soil would be <br /> thin spread or removed from the site as required. <br /> Seven of the eight proposed structures for the Project are angle structures and would be set on <br /> drilled pier concrete foundations to support the higher stress. The drilled pier would typically have a <br /> diameter of six to eight feet and typically require an excavation depth of approximately 25 feet, <br /> depending on soil conditions and design requirements. The excavation is filled with concrete and a <br /> concrete foundation is set,the pole or structure is then bolted to the foundation. <br /> Environmental Assessment 1 <br /> PUC Docket E002/IL-11-223 Page 16 <br /> 1 <br />