Orono Substation Expansion - Enviromental Assessment (1)
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Expansion - Enviromental Assessment (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/23/2021 2:52:01 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 INTRODUCTION <br /> Xcel Energy (applicant) has made application to the Minnesota Public Utilities Commission <br /> ' (Commission) for a route permit under the alternative permitting process of the Power Plant Siting <br /> Act(Minnesota Statute 216E). The route permit application is for the replacement of the existing <br /> 69 kV Orono Substation with a larger 115 kV substation at the same site and for the construction of <br /> ' approximately 0.4 miles of double circuit 115 kV transmission line,and relocation of approximately <br /> 0.2 miles of single-circuit 115 kV transmission line. <br /> ' Xcel Energy proposes to construct the Orono Substation Expansion and new 115 kV Transmission <br /> Line Project(Project). The Project is located entirely within the city of Orono in Hennepin County. <br /> As proposed,the Project would replace the existing 69 kV Orono Substation with a new 115 kV <br /> ' substation at the same location,but with a larger footprint. The Project would connect the new <br /> substation to the existing Xcel Energy 115 kV transmission line 0831 through a new double circuit <br /> 115 kV transmission lines of approximately 0.4 miles. Xcel Energy also proposes to relocate <br /> approximately 0.2 miles single circuit 115 kV transmission line as part of the Project. While not part <br /> of the Route Permit requested by Xcel Energy,approximately 400 feet of the existing Great River <br /> Energy (GRE) 69 kV transmission line BD would be rerouted around the expanded Orono <br /> ' Substation. <br /> Xcel Energy proposes to use steel single-pole structures with spans of approximately 300 to 500 feet <br /> ' between poles; structure heights are anticipated to range from 70 to 90 feet for the single-circuit <br /> structures to 75 to 115 feet for the double-circuit structures. Xcel Energy is requesting a route width <br /> of approximately 400 feet,or 200 feet either side of the proposed alignment shown in the <br /> Application maps. The anticipated right-of-way for the new transmission line would be 75 feet. <br /> ' Xcel Energy estimates the total Project cost to be approximately$5.3 million dollars. <br /> Energy Facility Permitting(EFP) staff is tasked with conducting environmental review of <br /> ' applications for high-voltage transmission line route permits. The intent of the environmental <br /> review process is to inform the public,the applicant,and decision-makers about potential impacts <br /> and possible mitigation measures for a proposed high-voltage transmission line project. <br /> This environmental assessment (EA) covers the environmental review requirements in accordance <br /> with the Scoping Decision Document for this EA,and as outlined in Minnesota Rules 7850, for the <br /> ' proposed project and route permit application as follows: <br /> Section 1.0 - Introduction <br /> ' Section 2.0—Describes the regulatory framework associated with the project,which includes <br /> information on the certificate of need criteria,route permit requirements,and the alternative <br /> ' permitting processes. <br /> Section 3.0—Provides a detailed description of the Project as proposed by Xcel Energy and the <br /> ' Baker Park Reserve Route Alternative. Alternatives proposed,but not carried forward for detailed <br /> analysis are also described here. <br /> ' Section 4.0—Describes the methods used when constructing the transmission line along with clean- <br /> up and restoration,maintenance procedures,and utility rights-of-way acquisition. <br /> ' Environmental Assessment <br /> PUC Docket E002/TL-11-223 Page 1 <br />