Laserfiche WebLink
I <br /> I <br /> PERMIT COMPLIANCE FILINGS' <br /> I <br /> PERMITTEES: Great River Energy <br /> PERMIT TYPE: 115 kV High-Voltage Transmission Line Route Permit <br /> PROJECT LOCATION: Hubbard County, Minnesota <br /> PUC DOCKET NUMBER: ET2/TL-10-86 <br /> I <br /> Filing Permit <br /> Number Section Description Due Date <br /> Contact information for field ,,w , 0 days prior to <br /> 1. 4.2.1 <br /> representative construction <br /> 2. 4.3 Periodic Status Re. s P Not more than weekly I <br /> 3. 4.4 Complaint Pro e A Prior to start of construction <br /> 111 <br /> First contact with the <br /> 4. 4.5 No 'on andowners andowners after issuance <br /> I <br /> of permit <br /> 5. 4.1 na Profileof '., to a <br /> 30 days before right-of-way <br /> preparation or construction <br /> II <br /> 6. 4.4.6" <br /> tice of co ett a s ate of Three days prior to <br /> ep <br /> lacement i$;service energizing <br /> I <br /> 4 6' Provide As-b 1'.4 GPS information Within 60 days of <br /> 7. <br /> (ArcGIS files or similar) construction <br /> Plan Submit with Plan and <br /> 8. 5.1 Avian Mitigation Profile <br /> I <br /> 1 <br /> I <br /> ' This compilation of permit compliance filings is provided for the convenience of the Permittee and the I <br /> Commission. However,it is not a substitute for the permit;the language of the permit controls. <br /> Page2of2 I <br />